New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Open Space Acquisition Study
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Open Space Acquisition Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2014 11:08:45 AM
Creation date
8/7/2014 11:08:21 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> effort would be coordinated with the development of the white paper, and the GIS products and <br /> text would be merged for Council presentation. <br /> 3. Assist in Staff Meetings. Mar. - June 1996. <br /> Attend average of two staff meetings per month for three months at an average four hours each <br /> (including attendance and preparation). LCOG would participate with Eugene staff at meetings <br /> with other agencies (for example, State Parks, Willamalane, schools, Corps of Engineers). <br /> 4. Assist in Presentations to Eugene City Council. June 1996. <br /> LCOG will assist City staff in preparing staff materials for presentation to the Council and serve <br /> as back -up in making the presentation to the Council, as requested by Public Works. <br /> 5. Project Management. Mar. - June 1996. <br /> This LCOG internal management item is calculated at 10% of the total costs of other work <br /> activities. <br /> *Note: This proposal recognizes City of Eugene Public Works as the project manager and <br /> overall 'coordinator. Eugene is also responsible for printing copies of draft and final products. <br /> The community outreach phase is not included in this proposal. This proposal does not include <br /> LCOG analysis of existing or future funding options or implementing strategies. Setting <br /> priorities would occur during the second step, which involves the public. The products do not <br /> constitute a land use plan. <br /> B. SCHEDULE <br /> The attached schedule indicates that the white paper on existing goals and policies and the GIS <br /> products will be presented to the Council in June. <br /> C. BUDGET <br /> LCOG costs are shown on an attached table. The LCOG proposal is for $28,800 in FY96. <br /> LCOG: \\ CLSRV100\LG5 \WETLANDS\OSPROP <br /> Last Saved: April 5, 1996 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.