New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Open Space Acquisition Study
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Open Space Acquisition Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2014 11:08:45 AM
Creation date
8/7/2014 11:08:21 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAINTENANCE OF PARKS AND RECREATION ASSETS <br /> CAPITAL NEEDS <br /> Backstops: Amazon Century, Kincaid (2), North Westmoreland (2) $75,000 <br /> Graham Field Restroom/Concession replacement 120,000 <br /> Player benches, bleachers 30,000 <br /> Turf drainage (Berkeley, Acorn, Amazon, University, Skinner, others -- 15 acres <br /> of Cambridge Drainage system) 450,000 <br /> Irrigation upgrades and maxicom connections 200,000 <br /> Trail rehab (material and equipment support for volunteers) 50,000 <br /> Signs -- new and replacements (average 2.5 identifications per park, 2.5 regulatory <br /> signs per park = $3250 per site X 35 sites = say) 115,000 <br /> Amazon Ballfield Lights 150,000 <br /> Playground Equipment Replacement 150,000 <br /> Park Restrooms at University, Amazon Ballfield, Fairmount 270,000 <br /> Maintenance Shops at Owens (92,000) and Hendricks (273,000) 365,000 <br /> Rock wall repairs around Skinner Butte 50,000 <br /> Parking repaving and slurry seals 100.000 <br /> Maintenance total (this page) $2,125,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.