MAINTENANCE OF PARKS AND RECREATION ASSETS <br /> CAPITAL NEEDS <br /> Backstops: Amazon Century, Kincaid (2), North Westmoreland (2) $75,000 <br /> Graham Field Restroom/Concession replacement 120,000 <br /> Player benches, bleachers 30,000 <br /> Turf drainage (Berkeley, Acorn, Amazon, University, Skinner, others -- 15 acres <br /> of Cambridge Drainage system) 450,000 <br /> Irrigation upgrades and maxicom connections 200,000 <br /> Trail rehab (material and equipment support for volunteers) 50,000 <br /> Signs -- new and replacements (average 2.5 identifications per park, 2.5 regulatory <br /> signs per park = $3250 per site X 35 sites = say) 115,000 <br /> Amazon Ballfield Lights 150,000 <br /> Playground Equipment Replacement 150,000 <br /> Park Restrooms at University, Amazon Ballfield, Fairmount 270,000 <br /> Maintenance Shops at Owens (92,000) and Hendricks (273,000) 365,000 <br /> Rock wall repairs around Skinner Butte 50,000 <br /> Parking repaving and slurry seals 100.000 <br /> Maintenance total (this page) $2,125,000 <br />