New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium. June - September 1999
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
4J Stadium. June - September 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 2:55:05 PM
Creation date
8/6/2014 2:51:56 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AUG -26 -1999 08:09 SD4J FACILITIES MANAGMENT 15416873686 P.09/13 <br /> • <br /> Eugene MtAlodclSOals Fields <br /> P vposet to WOGS <br /> sawn Pam 2 <br /> FEE <br /> Total Proposed Lump Sum Fee S210,800 <br /> We based our fee on the following scenario, which we discussed with you over the phone. <br /> High -End Construction Cost of Synthetic Fields 5900,000 X 4 = 3,600,000 <br /> Fee based on 8% = 5288,000/4 fields = $72,000. <br /> Breakdown of Fees by Field: <br /> First Field $72,000 <br /> Three remaining fields (30% credit due to reduced amount of CD effort) <br /> off -sire design improvements and off -site engineering $50,400 X 3 5151,200 <br /> Total High End Fan $223,000 <br /> Low -End Construction Cost of Synthetic Fields 5800,000 X4 = 3,200,000 <br /> Fee based on 8% = S256,000/4 fields = S64,000. <br /> Breakdown of Fees by Fletd: <br /> First Field 364.000 <br /> Three remaining fields (30% credit due to reduced amount of CD effort) <br /> off-site design improvements and off -site engineering 544,800 X 3 5134.400 <br /> Total High End Fee 3196,400 <br /> Split High and Low Fee (3223,000 ♦ 195,400)/2 = $21%800 <br /> • <br /> As we discussed, me proposed split fee is the lowest we will go. We feel this is a very <br /> competitive fee for this work and will provide WBGS with the expertise and the additional design <br /> team effort to complete this project on the tight time frame proposed by the School District and the <br /> City. <br /> As discussed, if you wish to have this work completed under the Athletics name we are open to <br /> this. However all contracts between are two flrrns will be through WRG Design, Inc. Please cell <br /> should you have any Questions or need any further clarification on the above scope and fee. <br /> Thank -you Bill. <br /> Sincerely, <br /> WRG Design, Inc. <br /> Jon P. eimann. P.E. <br /> Principal <br /> C: Doug Woumell, Athletics <br /> WWRGDKSYS USERSUPR' WlES1S .2G09WBGSsoepeondfeelseer.dx <br /> W R G <br /> o E a l oo N I N c <br />
The URL can be used to link to this page
Your browser does not support the video tag.