UNSIGNALIZED INTERSECTION SIMULATION <br /> Location: East Access / Willakenzie Road <br /> 1 Project: Sheldon High School <br /> Date and Time: 6 -3 -98 <br /> . Alternative: Existing Traffic Volumes <br /> Free Flow 20% Speed 15 mph Grade 0% <br /> L'f,ti [feet] Storage <br /> Volume 70 1 103 Free Flow 40% <br /> T Lanes 1 1 Speed 35 mph <br /> I 90 %tile QUEUE 1 4 Grade 0% <br /> LOS B D E <br /> [sec/veh] DELAY 7.3 21.2 41.1 <br /> DELAY LOS 90 %tile Lanes Volume Storage <br /> i <br /> East Access J P [sec/veil] QUEUE - [feet] <br /> S TOP 0.0 A 61 <br /> <' 0.0 A 0 2 312 <br /> l <br /> Willakenzie Road v 3.0 A 0 1 135 <br /> 13 • 1 1 A 3.0 <br /> 278 2 0 A 0.0 <br /> ft 31 A 0.0 STOP <br /> D <br /> 11 Storage Volume Lanes , 90 %tile LOS DELAY <br /> <e> Shopping Center <br /> [feet] QUEUE [sec/N./eh] <br /> r 11.3 7.8 6.4 DELAY [sec/veh] <br /> C B B LOS <br /> Free Flow 40% 1 90 %tile QUEUE <br /> iti Speed 35 mph 1 Lanes <br /> Grade 0% 21 2 99 Volume <br /> Storage [feet] <br /> 1 Free Flow 50% Speed 15 mph Grade 0% <br /> Analysis Period: 60 Minutes Number of Runs: 10 Total Simulation Time: 10.0 Hours <br /> ii <br /> WARNINGS: <br /> Bay Overflowed Bay Blocked <br /> il <br /> Quantity Duration Percentage Quantity Duration Percentage <br /> > <br /> It <br /> t <br /> ?I <br /> d <br /> 1 C: \INTERSIM \SHELEAST.USI I n to rS I m TM (` , 2.0) <br />