CAC Item #10 - ATTACHMENT 2 Page 1 of 3 <br /> Transportation Enhancement Application for 2009 -2011 Funding <br /> NOTICE OF INTENT <br /> This Notice is required for all applicants. FAX to: (5(B) 986 -3290 or mail to: <br /> ODOT Transportation Enhancement Program, 355 Capitol St NE, Rm 326 Salem OR 97301 -3871 <br /> Due: March 23, 2006 <br /> INSTRUCTIONS: (1) Enter project information in the boxes below. (2) Attach a letter or narrative <br /> (1 page max.) explaining the need for the project, type and extent of proposed work, property ownership <br /> status, funds requested and matching funds available, and the role of any co- applicants or partners. <br /> (3) Attach a vicinity map and site map or other appropriate graphics -1 or 2 pages. <br /> APPLICANT <br /> Agency City of Eugene Contact Lee Shoemaker <br /> Address 858 Pearl Street, 3` Floor Title Bicycle and Pedestrian <br /> Eugene, OR 97401 Coordinator <br /> Telephone 541- 682 -5471 <br /> Email lee.shoemaker@ci.eugene.or.us <br /> CO- APPLICANT (if any) <br /> Name Contact <br /> Address Title <br /> Telephone <br /> PROJECT (name, location, and one -line description) <br /> Spring Connector Multi -Use Path; Spring Boulevard, 29 Avenue to 30 Avenue, Eugene, <br /> OR; Construct a 12' wide concrete path to current standards, including lighting, to connect <br /> two residential neighborhoods with a major roadway leading to the local community college. <br /> COST SUMMARY 1 RIGHT NEEDS <br /> TE Funds Requested: $714,509 Property to be purchased? <br /> Matching funds $ 81,779 [X] yes [ ] no [ ] don't know yet <br /> Other Non -TE costs Easements or donated property? <br /> Total Project Cost $796,288 [ ] yes [ ] no [ X ] don't know yet <br /> COORDINATION ISSUES (mark all that apply) <br /> [ X ] Project located in MPO jurisdiction [ ] Project on railroad property <br /> (metropolitan area with population >50,000) [ ] Project at or near a railroad crossing <br /> [ ] Project within state highway right -of -way [ ] Contribution from other than applicant <br /> [ ] Use of land owned by another agency [ ] Maintenance by other than applicant <br /> ODOT Reply Area <br /> [ ] APPROVED TO PROCEED with an application for FY 2009 -2011 funding. <br /> [ ] Application requires advance coordination or endorsements. See 'Part 2 Checklist attached. <br /> [ ] Please call the TE Program Manager at (503) 986 -3528 to discuss this proposal before applying. <br /> 1 <br />