New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Ridgeline Trail
COE
>
PW
>
POS_PWM
>
Parks
>
POS Director
>
Ridgeline Trail
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 1:21:46 PM
Creation date
8/6/2014 1:21:31 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Document_Number
Ridgeline Trail
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5) City would recognize the West Amazon alignment as part of Ridgeline Trail system, <br /> and standard signage should be erected at the West Amazon /Martin intersection. <br /> 6) Canyon Drive trail section would be considered a neighborhood connector to the main <br /> Ridgeline Trail system. <br /> 7) Canyon Drive section would follow a creek side alignment rather than a slope- traverse <br /> alignment, for best visitor experience and least erosion /sedimentation risk.. <br /> 8) Since bridge construction costs could limit the viability of a creekside alignment for the <br /> Canyon Drive section, SEN pledges skilled volunteer labor for bridge design and <br /> construction, suitable to meet city engineering standards. <br /> 9) Trail - building efforts on the upper Headwaters Trail section and the Canyon Drive <br /> section should be proceed in parallel with signage improvements and neighborhood <br /> maintenance of the West Amazon section. <br /> 10) Immediate neighbors, who have been concemed about the environmental and cultural <br /> impacts of a Canyon Drive terminus for the Headwaters Trail, are endorsing this proposal <br /> as appropriately moderating those impacts. <br /> Thank you again for your consideration of these points. We look forward to mutual <br /> acknowledgement that this approach defines a win -win proposition with consensus support, <br /> to result in timely and appropriate Amazon Headwaters Trail development. <br /> Respectfully, <br /> Kevin Matthews <br /> President, :�•uth st Neighbors <br /> Davi • Monk <br /> Vice President, Southeast Neighbors <br /> • <br /> www.Soufiheas- Neighbors.or9 page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.