City of Eugene <br /> Johnny Medlin <br /> April 16, 2007 <br /> Page 2 <br /> about the size of a passenger car. The bulldozer is used to tow the drill rig over ruff terrain. <br /> Photos of the flatbed truck and drilling equipment are attached. <br /> Access through park property will only be over existing gravel and dirt lanes. We will not run <br /> over, cut down, trample, or remove any vegetation and we will off load and load our equipment <br /> directly onto and off of the adjacent property. No equipment will be stored on park property or <br /> left overnight. We would like to begin using parks property as soon as possible during the week <br /> of April 16, 2007. Once we obtain a parks use permit our use of parks property should be <br /> completed within 4 or 5 days. However, for scheduling purposes we would like to obtain a <br /> permit valid through May 4, 2007. <br /> Sincerely, <br /> SHANNON & WILSON, INC. <br /> w <br /> - , - -- <br /> )a vid i' Higgins, CEG <br /> Senior Engineering Geologist <br /> Cell Phone: 503- 887 -6135 <br /> DJH:DJH /djh <br /> Enclosures: Site Plan <br /> Photos of Route and Equipment <br /> 24 -1- 03401 -001 <br />