Pesticides currently stored on site (verify storage requirements and separations) Can some of this be <br /> stored off -site or delivered on an as need basis: <br /> Roundup 2.5 gals. <br /> MCPA 2.5 gals. <br /> Funginex 1 gal. <br /> Polysul 15 gals. <br /> Champ(copper) 2.5 gals. <br /> Devrinol 150 lbs. <br /> Casoron 50Ibs. <br /> Snapshot 500Ibs. <br /> Based upon the quantity of materials listed above and required storage requirements, I have some concern <br /> that the space allocation is not adequate. This will need to be verified. <br /> I propose the following course of action at this point: <br /> 1. Review proposed space allocation and quantities of stored items with appropriate staff. <br /> 2. Establish meeting with appropriate staff (selected by Johnny) to review, discuss and agree upon: <br /> a. Quantities and types of stored materials <br /> b. Basic space needs and siting requirements (to be verified by the architect) <br /> c. Discuss budget and funding source <br /> d. Establish initial project implementation schedule (discuss schedule for moving plants) <br /> e. Discuss selection process for architect <br /> f. Assign specific tasks where appropriate <br /> g. Establish user group meeting schedule <br /> Page 2 <br />