New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Owen Rose Garden
COE
>
PW
>
POS_PWM
>
Parks
>
POS Director
>
Owen Rose Garden
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 10:21:41 AM
Creation date
8/6/2014 10:17:50 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
Owen Rose Garden
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEDLIN Johnny R <br /> From: BLACK Bradley G <br /> To: MEDLIN Johnny R <br /> Subject: Owen Rose Garden Maintenance Facility Space Requirements, Etc. <br /> Date: Wednesday, January 17, 1996 10:51 AM <br /> Hi Johnny <br /> I would like to summarize the information that I have been able to pull together about the Owen Rose <br /> Garden Maintenance facility. Please review the information presented here and let me know if there are <br /> any errors. I would like to get this project moving. Please review my suggested plan for implementing this <br /> project. I will need your assistance in setting up a meeting to discuss the project needs, schedule, budget, <br /> etc. My schedule is fairly free next week except for Tuesday. <br /> Please give me a call after you've had a chance to review this. <br /> LONG TERM SPACE NEEDS (per Dick Morgan's memo of August 14, 1995) <br /> 1 - Office 1 20 sf <br /> 1 - Lunch Room 120 sf <br /> 1- Unisex restroom with shower 80 sf <br /> 1 - Heated work area 180 sf <br /> 1 - Heated storage area 180 sf <br /> 3 - Unheated garage stalls with lights 792 sf <br /> TOTAL AREA REQUIRED: 1472 sf <br /> To implement the long term solution the following will need to occur: <br /> 1. Set up of a temporary office facility (possible use of "Wistec" trailer). <br /> 2. Removal /relocation of plants. <br /> 3. Demolition of existing structure. <br /> 4. Site prep and construction of new facility. <br /> In the new facility, it appears that the following potentially hazardous materials may require specific <br /> storage. As I understand it, some items could be stored off site, provided they are not used on a routine <br /> basis. These need to be identified. I have MSDS sheets for most products and will use these for <br /> discussions with the Fire Marshal when appropriate. <br /> Power Equipt.: 2 edgers <br /> 4, 21 inch mowers <br /> 1 Toro tri -plex mower <br /> 1 blower <br /> 1 vacuum <br /> 1 backpack blower <br /> 1 chainsaw <br /> 1 mantis tiller <br /> 1 pressure washer <br /> 1 Daihatsu <br /> 1 Tractor (6 months of the year) <br /> All these pieces of equipment. have gas tanks and will require separate storage from fertilizers and other <br /> flammable products. <br /> Current storage of gas is in the 20 gallon range. The storage method will need to be examined. <br /> Fertilizer currently stored on site (verify if off site storage or delivery as needed is possible): <br /> Turf Fert. 1 ton <br /> Rose Fert. 1 ton <br /> Supplemental rose fert. (typically organic) 1 .5 tons <br /> Specialty fert. .5 ton <br /> Epsom salts 1 ton <br /> Agricultural lime .5 ton <br /> Bone meal 200 lbs. <br /> Dolomite lime 1 ton <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.