04/03/96 09:12 ^5034844184 /I , I�j001 <br /> r <br /> MEMO <br /> From: Brad Black, Project Manager <br /> Facilities Management <br /> Public Works, City of Eugene <br /> 210 Cheshire Avenue <br /> Eugene, Oregon 97401 <br /> 541.984.8354 Office <br /> 541.484.4184 FAX <br /> To: Johnny Medlin, PWM <br /> Dee Grissell, PWM <br /> 683 -6883 <br /> Date: April 3, 1996 <br /> Re: Updated costs for the Owen Maintenance Facility <br /> Number of pages transmitted: 5 <br /> Attached are the following: <br /> 1. Revise project budget estimate for Options 1 through 3 <br /> 2. Breakdown of construction costs for Options 2 and 3 <br /> 3. Floor plan sketch forwarded to RSA <br /> As a review, Option 1 was the first design costed out. Option 2 is the masonry building with a <br /> reduced building area. Option 3 is for the metal building design using the reduced building area. <br /> The costs break down as follows: <br /> Option 1: $440,078 <br /> Option 2: $360,213 (reduced area - masonry building) <br /> Option 3: $252,755 (reduced area - metal building) <br /> Please review the attached. If you have any questions, please call me. <br /> Thank you.... <br />