wetland mitigation, maintaining minimal channel flow capacity, and FEMA approval, <br /> however it would be more costly to build. <br /> 2. What is the flow capacity of this channel and will it allow for a depressed profile <br /> culvert crossing? <br /> 3. How much would Engineering charge us for them to design a culvert crossing? a <br /> bridge crossing? <br /> The project seems to have grown beyond the original "get a fill permit" and this is <br /> probably the time for a process check. I have attached a copy of the information I <br /> sent to Wayne back in April. <br /> Thanks for you help, <br /> -jw <br />