GGARDDN.MEM Page 2 <br /> wetland mitigation, maintaining minimal channel flow capacity, and FEMA <br /> approval, however it would be more costly to build. <br /> 2. What is the flow capacity of this channel and will it allow for a <br /> depressed profile culvert crossing? <br /> 3. How much would Engineering charge us for them to design a culvert <br /> crossing? a bridge crossing? <br /> The project seems to have grown beyond the original "get a fill permit" <br /> and this is probably the time for a process check. I have attached a <br /> copy of the information I sent to Wayne back in April. <br /> Thanks for you help, <br /> - jw <br /> • <br />