Contingency approved by Policy Committee: $ 192,984.00 $ 377,735.00 $ 298,729.80 $ 271,989.20 <br /> (28% of fields) <br /> parks fields City 41 Description <br /> Wood Takeoff Ards NEHS, PO e1 5/11/2000 $ - $ (1,195.80) $ (334.82) $ (880.98) <br /> Over -ex NEHS, PO #2 5/15/2000 $ (8,809.00) $ (1,908.52) $ (4,902.48) <br /> Maxicom by Contracts, PO #3 5/18/2000 $ (7,507.50) $ (7,507.50) <br /> Add Discus, SHS, PO # 4 5/18/2000 $ (4,373.30) $ (1,224.52) $ (3,148.78) <br /> FW Steel Contribution, PO # 5 5/25/2000 $ 2,000.00 $ 2,000.00 <br /> Cntrl VNres NEHS, PO # 8 5/31/2000 $ (2,742.00) $ (787.76) $ (1,974.24) <br /> Expanded RR, PO 07 8/1/2000 $ (54,080.00) $ (54,080.00) <br /> NEHS Pwr Pole, PO # 8 8/1/2000 $ (850.00) $ (182.00) $ (468.00) <br /> Revised drainage SEHS, CCI 11, PO #9 8/12/2000 $ (7,454.00) $ (2,087.12) $ (5,388.88) <br /> Fields waterline, SHS, CCI 20, PO #10 8/12/2000 $ (3,087.00) $ (884.38) $ (2,222.84) <br /> SE SICi? 4 PA1P'$1f",t sc)'p,i 1+ , ' '6 <br /> SHS add discus, CCI 8.2, PO # 12 6/15/2000 $ (1,000.00) $ (280.00) $ (720.00) <br /> NEHS stm move, CCI 33, PO # 13 8/18/2000 $ (515.00) $ (144.20) $ (370.80) <br /> NEHS, move javelin, CCI 34, PO # 14 8/18/2000 $ (225.00) $ (63.00) $ (182.00) <br /> CHS Overexcavation, CCI 44, PO #18 8/29/2000 $ (11,510.70) $ (3,223.00) $ (8,287.70) <br /> New IRR mainline NEHS, CCI 35, PO #17 6/29/2000 $ (8,524.00) $ (1,828.72) $ (4,897.28) <br /> Ind Mod at CYMS, CCI 25, PO #18 6/29/2000 $ (522.00) $ (522.00) <br /> Add mainline coon. CHS, CCI 39, PO 019 6/29/2000 $ (1,995.00) $ (558.60) $ (1,436.40) <br /> Batting cage recpt, CCI 24, CHS, PO #20 8/29/2000 $ (2,339.00) $ (854.92) $ (1,884.08) <br /> Bollards NEHS, CCI 14, PO # 21 8/29/2000 $ (1,781.00) $ (498.88) $ (1,282.32) <br /> Ticket Booth J boxes, CCI 32, PO #22 7/5/2000 $ (2,888.78) $ (2,888.78) <br /> Well electrical-Fin Ln, CCI 40, PO #23 7/5/2000 $ (2,003.00) $ (2,003.00) <br /> Add over -ex CHS, P00 24 7/14/2000 $ (21,405.20) $ (5,993.46) $ (15,411.74) <br /> Fix "D" NEHS, P0025 7/17/2000 $ (11,141.50) $ (3,119.82) $ (8,021.88) <br /> CYMS Stm Conn., P00 28 7/21/2000 $ (473.30) $ (473.30) <br /> SHS Field Hose bibbs. P00 27 7/21/2000 $ (1,039.00) $ (290.92) $ (748.08) <br /> SEHS irr main upsize, PO# 28 7 /21 /2000 $ (1,913.00) $ (535.84) $ (1,377.38) <br /> SEHS ovsrexcavation, PO# 29 7 /25/2000 $ (7,882.00) $ (2,201.36) $ (5,860.84) <br /> CHS transformer repair, P0030 7 /25/2000 $ 1,070.00 $ 299.80 $ 770.40 <br /> skate park changes, PO431 8/3 /2000 $ (3,259.00) $ (3,259.00) <br /> SHS firelane vault Ild, PC* 32 8/3/2000 $ (1,514.00) $ (1,514.00) <br /> SHS- msadowlrk ir, CCI51, PO#33 8/3/2000 $ (297.00) $ (297.00) <br /> CHS sofbll Ir, CCI 55, P0034 8/3/2000 $ (1,588.00) $ (1,588.00) <br /> CYMS it changes, 00156, P0035 8/3/2000 $ (2,054.00) $ (2,054.00) <br /> NEHS redo take off brds, P00 38 8/3/2000 $ (2,328.00) $ (651.28) $ (1,874.72) <br /> SHS delete mowsrip, P00 37 8/3/2000 $ 1,729.00 $ 484.12 $ 1,244.88 <br /> CHS, revised discus, PO438 8/3 /2000 $ (277.00) $ (77.58) $ (199.44) <br /> CHS potwaterconn, P0039 8/4 /2000 $ (303.00) $ (303.00) $ (189.68) $ (436.32) <br /> CHS Alt D4, P0#40 8/4 /2000 $ (12,901.00) $ (12,901.00) <br /> SEHS over ex, CC183, PO#41 8/10 /2000 $ (19,192.00) $ (5,373.76) $ (13,818.24) <br /> NEHS Curb removal, P0842 8/10 /2000 $ (1,457.00) $ (407.98) $ (1,049.04) <br /> CHS Overex, P0043 8/10 /2000 $ (4,916.00) $ (1,376.48) $ (3,539.52) <br /> CYMS conc walk, CCI82, P0844 8/14 /2000 $ (1,342.00) $ (1,342.00) <br /> SEHS fire Im pvng, P0045 8/18/2000 $ (7,880.00) $ (7,880.00) <br /> SHS CT Can, CCI84, P0046 8/21 /2000 $ (808.00) $ (189.68) $ (438.32) <br /> CHS relocated path, CCI78, PO447 8/21 /2000 $ (2,534.00) $ (2,534.00) <br /> CHS trench fabric, CCI75, PO449 8/21 /2000 $ (140. $ (14 <br /> SHS fences & Gates, CCI85, P00 50 8/21 /2000 $ (4,878.00) $ (4,878.00) <br /> CYMS concrete around pole, PO451 8/22/2000 $ (609.00) $ (809.00) <br /> SHS field entrance concrete, PO#52 8/28/2000 $ (912.00) $ (912.00) <br /> SHS removable bollards, P0#53 9/6/2000 $ (1,069.00) $ (1,069.00) <br /> ALL, yard hydrant bollards, P0#54 9/8/2000 $ (1,988.00) $ (550.48) $ (1,415.52) <br /> CHS abestos pipe repair, P01055 9/8/2000 $ (2,304.00) $ (845.12) $ (1,858.88) <br /> CHS skate park water, P0056 9/12/2000 $ (1,734.00) $ (1,734.00) <br /> CHS re- Install storm, PO#57 9/12/2000 $ (1,295.00) $ (1,295.00) <br /> CYMS pump house removal, P0058 9/12/2000 $ (3,250.00) $ (3,250.00) <br /> SEHS hydrant bollards, PO459 9/27/2000 $ (1,004.00) $ (281.12) $ (722.88) <br /> SEHS Irr change, P0080 10/2/2000 $ (2,099.00) $ (587.72) $ (1,511.28) <br /> SEHS speed bumps, P0081 10/4/2000 $ (800.00) $ (224.00) $ (576.00) <br /> CHS MH, P01162 10/4 /2000 $ (2,381.00) $ - $ (2,381.00) $ - <br /> SEHS waterline, P0083 10/4 /2000 $ - $ (2,363.00) $ (881.84) $ (1,701.38) <br /> CHS backstop, P0084 10/10 /2000 $ (4,355.00) $ - $ (4,355.00) <br /> ALL, heavy duty gates, PO#85 10/10/2000 $ (312.00) $ (312.00) $ (399.38) $ (224.84) <br /> NEHS shot repair, PO#66 10/10 /2000 $ - $ (4,885.00) $ (1,311.80) $ (3,373.20) <br /> CHS, aculeratlon, P01167 10/11/2000 $ (1,351.00) $ - $ (1,351.00) $ - <br /> Parks, surface sealer, PO#88 10/11/2000 $ (1,844.00) $ - $ (1,644.00) $ - <br /> Parks, cone for site furnishings, PO#69 10/17 /2000 $ (3,138.00) $ - $ (3,138.00) $ - <br /> SHS, move 3 trees, P0070 10/17 /2000 $ (238.00) $ - $ (238.00) $ - <br /> CHS, add gate to tennis crt, PO #71 10 /23/2000 $ (387.00) $ - $ (387.00) $ - <br /> CHS/NEHS Ped. AD grates, PO #72 10/27/2000 $ (183.20) $ (798.80) $ (386.30) $ (573.70) <br /> SHS MH lid, P0073 10/27 /2000 $ (852.00) $ - $ (852.00) $ - <br /> CHS, field AD, P0074 10/27/2000 $ - $ (2,198.00) 5 (815.44) $ (1,582.56) <br /> CHS irwires, P0075 11/1 /2000 $ (1,350.00) $ - $ (1,350.00) $ <br /> $ (111,125.00) $ (158,219.08) $ (150,209.88) $ (119,134.40) total <br /> BONES P001 -goal posts 7 /20 /2000 $ (1,258.00) $ (1,258.00) <br /> Bones, re-mob for paint, PO#2 9 /25/2000 $ (1,200.00) $ (338.00) $ (884.00) <br /> LH Mortis - scorebrd conduit, PO #1 8/3/2000 $ (4,070.00) $ (4,070.00) <br /> LH Morris, CB's, P082 8/29/2000 $ (1,978.00) $ (553.84) $ (1,424.18) <br /> LH Morris, NEHS pole move, PO#3 9/19 /2000 $ (601.00) $ (188.28) $ (432.72) <br />