Contingency approved by Policy Committee: $ 192,984.00 $ 377,735.00 8 298,729.80 $ 271,969.20
<br /> (28% of fields)
<br /> parks fields Clty 4j Description
<br /> Wood Takao# 9rrk NEHS, PO 01 5/11/2000 $ - $ (1,195.80) $ (334.82) $ (860.98)
<br /> Over -ex NEHS, PO #2 5/15/2000 $ (6,809.00) $ (1,908.52) $ (4,902.48)
<br /> Maxicom by Contractr, PO #3 5/16/2000 $ (7,507.50) $ (7,507.50)
<br /> Add Discus, SHS, P004 5/18/2000 $ (4,373.30) $ (1,224.52) $ (3,148.78)
<br /> FW Steel Contribution, PO # 5 5/25/2000 $ 2,000.00 $ 2,000.00
<br /> Cried Wires NEHS, PO 0 8 5/31/2000 $ (2,742.00) $ (767.78) $ (1,974.24)
<br /> Expanded RR, PO 07 8/1/2000 5 (54,080.00) $ (54,080.00)
<br /> NEHS Pwr Poke, PO # 8 8/1/2000 $ (650.00) $ (182.00) $ (468.00)
<br /> Revised drainage SEHS, CC1 11, PO #9 8/12/2000 $ (7,454.00) 8 (2,087.12) $ (5,368.88)
<br /> Fields waterline, SHS, CCI 20 PO #10 6/12/2000 $ (3,087.00) $ (864.36) s (2,222.84)
<br /> V. SHS add discus, CCI 8.2, PO 6/15/2000 �. $ (1,000.00) $ (280.00) $ (720.00)
<br /> NEHS stm nave, CCI 33, PO 0 13 6/16/2000 $ (515.00) $ (144.20) $ (370.80)
<br /> NEHS, move javelin, CCI 34, PO* 14 8/162000 $ (225.00) $ (63.00) $ (162.00)
<br /> CHS Overexavation, CCI 44, PO 016 8/29/2000 $ (11,510.70) $ (3,223.00) $ (8,287.70)
<br /> New IRR mainline NEHS, CCI 35, PO017 6/292000 $ (8,524.00) $ (1,826.72) $ (4,897.28)
<br /> In( Mod at CYMS, CCI 25, PO 018 6/29/2000 $ (522.00) $ (522.00)
<br /> Add mainline corm. CHS, CCI 39, PO 019 6/29/2000 $ (1,995.00) $ (558.60) $ (1,436.40)
<br /> Batting age rocapt, CCI 24, CHS, PO #20 6/29/2000 $ (2,339.00) $ (654.92) $ (1,884.08)
<br /> Bollards NEHS, CCI 14, PO # 21 6/29/2000 $ (1,781.00) 8 (498.68) $ (1,282.32)
<br /> Ticket Booth J boxes, CCI 32, PO 022 7/5/2000 $ (2,686.78) $ (2,666.78)
<br /> Well electrical-Fire Ln, CCI 40, PO 023 7/5/2000 $ (2,003.00) $ (2,003.00)
<br /> Add over-sx CHS, PO0 24 7/142000 8 (21,405.20) $ (5,993.48) $ (15,411.74)
<br /> Fbc NEHS, P0025 7/17/2000 $ (11,141.50) 8 (3,119.82) $ (8,021.88)
<br /> CYMS Stm Conn., P00 28 7/21/2000 $ (473.30) $ (473.30)
<br /> SHS Field Hose bibbs. PO0 27 7/21/2000 $ (1,039.00) $ (290.92) $ (748.08)
<br /> SEHS irr main upsize, PO0 28 7212000 $ (1,913.00) $ (535.84) $ (1,377.38)
<br /> SEHS overexcavation, PO0 29 7/25/2000 $ (7,882.00) $ (2,201.38) $ (5,880.64)
<br /> CHS transformer repair, PO030 7/25/2000 5 1,070.00 S 299.80 $ 770.40
<br /> skate park changes, P0031 8/3/2000 $ (3,259.00) $ (3,259.00)
<br /> SHS **lane vault lid, PO0 32 8/3/2000 $ (1,514.00) $ (1,514.00)
<br /> SHS- meadowkk in, CCI51, PO033 8/3/2000 $ (297.00) 5 (297.00)
<br /> CHS sofbll in, CCI 55, P0034 8/3/2000 $ (1,588.00) 5 (1,586.00)
<br /> CYMS Irr changes, CC156, PO035 8/3/2000 $ (2,054.00) $ (2,054.00)
<br /> NEHS redo take off brds, P00 36 8/3/2000 $ (2,326.00) $ (651.28) $ (1,674.72)
<br /> SHS delete mowstrip, P00 37 8/3/2000 8 1,729.00 5 484.12 5 1,244.88
<br /> CHs, revised discus, PO038 6/3/2000 s (277.00) $ (77,56) $ (199.44)
<br /> CHS pot water corm, PO039 8/4/2000 $ (303.00) $ (303.00) $ (169.68) $ (436.32)
<br /> CHS Alt D4, P0040 8/4/2000 $ (12,901.00) $ (12,901.00)
<br /> SEHS over ex, CC183, PC#41 8/10/2000 $ (19,192.00) $ (5,373.76) $ (13,818.24)
<br /> NEHS Curb removal, P0042 8/10/2000 $ (1,457.00) $ (407.96) $ (1,049.04)
<br /> CHS Overex, P0043 8/10/2000 $ (4,916.00) $ (1,376.48) $ (3,539.52)
<br /> CYMS core walk, CCI82, P0044 8/14/2000 $ (1,342.00) $ (1,342.00)
<br /> 5E115 tin kn pvng, P0045 8/16/2000 s (7,880.00) 5 (7,880.00)
<br /> SHS CT Can, CCI84, P0046 8212000 $ (806.00) $ (169.68) $ (436.32)
<br /> C115 relocated path, CC176, P0047 8/21/2000 $ (2,534.00) $ (2,534.00)
<br /> ; . ".7, r v;y .va,. .,.i, . eI .,.» ` is tm. , , t �, y �.: % �. r ,�. % d°P.,'..
<br /> CHS trench fabric, CC175, P0049 8/212000 $ (140.00) r i „ ' (140.00 ) ... >i .. ,� :, •, .
<br /> SHS fences & Gales, CC185, PO0 50 8/212000 $ (4,876.00) $ (4,876.00)
<br /> CYMS concrete around pole, PO#51 8/22/2000 $ (609.00) $ (609.00)
<br /> S115 field entrance concrete, PO052 8/28/2000 $ (912.00) $ (912.00)
<br /> SHS removable bollards, P0053 9/8/2000 $ (1,089.00) $ (1,069.00)
<br /> ALL, yard hydrant bollards, P0054 9/62000 $ (1,966.00) $ (550.48) $ (1,415.52)
<br /> CHS abestos pipe repair, P0055 9/8/2000 $ (2,304.00) $ (645.12) $ (1,658.88)
<br /> CHS skate park water, P0056 9/12/2000 $ (1,734.00) 5 (1,734.00)
<br /> CHS re- instal storm, P0057 9/12/2000 $ (1,295.00) 8 (1,295.00)
<br /> CYMS pump house removal, P0058 9/12/2000 $ (3,250.00) $ (3,250.00)
<br /> SE1-18 hydrant bollards, P0059 9/27/2000 $ (1,004.00) $ (281.12) $ (722.88)
<br /> SEHS Itr change, PO060 10/2/2000 $ (2,099.00) $ (587.72) $ (1,511.28)
<br /> SEHS speed bumps, P0061 10/4/2000 $ (800.00) 8 (224.00) $ (576.00)
<br /> CHS MH, P0062 10/4/2000 $ (2,381.00) $ $ (2,381.00) $ -
<br /> SEHS water**, P0063 10/4/2000 $ - $ (2,363.00) $ (881.84) $ (1,701.36)
<br /> CHS backstop, P0064 10/10/2000 $ (4,355.00) $ - $ (4,355.00)
<br /> ALL, heavy duty gates, P0065 10/10/2000 $ (312.00) $ (312.00) $ (399.38) 5 (224.64)
<br /> NEHS shot repair, P0088 10/10/2000 $ - $ (4,685.00) $ (1,311.80) 5 (3,373.20)
<br /> CHS, acceleration, P0087 10/11/2000 $ (1,351.00) $ - $ (1,351.00) $ -
<br /> Parks, surface sealer, P00188 10/11/2000 $ (1,644.00) $ - $ (1,644.00) $ -
<br /> Parks, conc for site furnishings, PO#69 10/17/2000 $ (3,138.00) $ • $ (3,138.00) $ -
<br /> SHS, move 3 trees, P0070 10/17/2000 $ (238.00) $ - $ (236.00) 5 -
<br /> CHS, add gate to tennis crt, P0071 10/23/2000 $ (387.00) $ - $ (387.00) $ -
<br /> CHS/NEHS Ped. AD grates, P0072 10/27/2000 $ (183.20) $ (796.80) $ (386.30) $ (573.70)
<br /> SHS MH lid, P0073 10/27/2000 $ (852.00) $ - $ (852.00) $ -
<br /> CHS, field AD, PO#74 10/27/2000 $ - $ (2,198.00) $ (815.44) $ (1,582.56)
<br /> CHS in wires, P0075 11/1/2000 $ (1,350.00) $ - $ (1,350.00) $ -
<br /> 5 (111,125.00) $ (158,219.08) $ (150,209.88) $ (119,134.40) total
<br /> BONES POI/1 -goal posts 7/20/2000 $ (1,258.00) $ (1,258.00)
<br /> Bones, re-mob for paint, PO#2 9/25/2000 $ (1,200.00) $ (336.00) $ (884.00)
<br /> LH Monis - scoroixd conduit, P001 8/3/2000 $ (4,070.00) $ (4,070.00)
<br /> LH Mortis, CB's, PO02 8/29/2000 $ (1,978.00) $ (553.84) 5 (1,424.18)
<br /> LH Morris, NEHS pole move, PO03 9/19/2000 $ (601.00) $ (168.28) $ (432.72)
<br />
|