management requirement about contingency allocation. This was simply a procedural process <br /> that made sense). <br /> 11-0K <br /> c. There may be $200,000+ left in the fields /lights construction contingency. The $ spent on Parks <br /> exceeds the $2,350,000 guaranteed amount. In fact, from my understanding of Teri's projections, <br /> it is likely to be closer to $2.5 to $2.55 million. <br /> 2.wI- <br /> d. Do we allocate the remaining fields /lights contingency back to City and District at 28 %/72 %, or <br /> do we allocate it to the District at 100% since the money spent on Parks appears to be exceeding <br /> the guarantee by approximately $200,000. If we do the latter, we would have to reallocate some <br /> previously allocated costs so that City $ would not go directly toward bleachers or emergency <br /> access (IGA requirements). <br /> e. The implication of all this is that if the first path in d is chosen, there will be potentially about <br /> $50,000 less of unused contingency toward the acquisition of bleachers. If the second path is <br /> taken, the full approximate $200,000 could be available. <br /> f. Where we stand with bleachers is this: We will be shortly going out to bid for a third time. In the <br /> last bid, we required a 6 foot high bottom row. The low bidder was non - responsive because they <br /> submitted on a 40 inch high bottom row. Their bid for 1000 seats at 40 inches high was $133,360. <br /> They also bid $22,941 for a structural system for future cover, which, although not absolutely <br /> essential, is what is really wanted and which would be very hard and expensive to retrofit in the <br /> future. The price for four sets of bleachers with desired structure is $625,204; without the desired <br /> structure it is $533,440. <br /> If the District Board decides to award a beverage services contract with 12 machine in every high <br /> school, and for and year period, the District is likely to receive $320,000 up- front. With $200,000 <br /> in contingency, $520,000 would be available; with $150,000 in contingency, $470,000 would be <br /> available. SEHS and SHS tell us that they have about $40,000 in pledges, each, toward <br /> bleachers. NEHS and CHS have only a few thousand dollars each in pledges. There is a small <br /> amount of additional funds in corporate sponsorships for advertising (future money). This year's <br /> funds, in part, have gone toward bleacher rental of $25,000 for 500 seats at each school for 2 -1/2 <br /> months. <br /> 2. Allocation of unused project management line item. In February the Policy Committee met <br /> and agreed to a number of alternates to be added back to the project due to some excellent bids <br /> we received in several categories. Add -backs occurred on the parks side and on the fields side. If <br /> projected savings in project management ($50,000) was included, there was sufficient money to <br /> fund all the add -backs included required gress lighting for the bleachers ($100,000). There is a <br /> difference of opinion about whether or the full cost of the egress lighting was part of the <br /> February solution. This needs to be re I ed by the Policy Committee. (There is currently about <br /> _ $50,000 in the overall budget earmark d r this line item). C„ ( <br /> NO pp <br /> kockcr E VAEK4 ENCY <br /> 3. Cost allocation for fence extension on Norwood at Meadowlark. As you may recall, we <br /> agreed to put a six foot fence along Norwood from the track to Meadowlark in order to induce <br /> people to park at SHS rather than along Norwood for kidsports and other youth events. Due to <br /> miscommunication and /or a difference of opinion, the fence was initially built as described, except <br /> that it did not continue the full length of Norwood to Meadowlark (it stopped by the ball field at <br /> Meadowlark) and it was only four feet rather than six feet for the last section nearest to <br /> Meadowlark. The Mayor noticed this and raised some concerns, and the fence was lengthened <br /> and the height was increased. There is a difference of opinion about whether this should be <br /> charged to the YSP account or the fields account. <br /> ti <br /> �1 ,,,� -4 - warra�,� em 9 10 (flelc6 <br /> o-�+E� issues . 90�00O A `1 `1 <br /> ti tzb , 600 1,066,5 cJ41 <br />