New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FEMA-DR-4169-OR PW:22 (Category B)
COE
>
PW
>
POS_PWM
>
Grants
>
Grant 101 - FEMA
>
FEMA-DR-4169-OR PW:22 (Category B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:41:19 PM
Creation date
7/24/2014 1:41:12 PM
Metadata
Fields
Template:
COE_Contracts
COE_Contract_Number
2014-00409
COE_Contract_Document_Type
Correspondence
COE_Contract_Status
Active
COE_Contract_Organization
FEMA / OEM (Oregon Office of Emergency Management)
COE_Identification_Info
2014-00409
Department
Public Works
Contract_Administrator
Schafer
Contract_Manager
Risdal / Lankston
Document_Number
2014-00409
External_View
No
Permanent_Retention
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Federal Emergency Management Agency E- Grants Page 4 of 11 <br /> PA- 10 -OR- 4169 -PW- 00022(0): <br /> A severe winter storm occurring February 6 -10, 2014, brought a mixture <br /> of arctic air, strong east winds, significant snowfall along with freezing <br /> rain and ice which caused damage to the city of Eugene, which created <br /> Damage Description and hazardous and safety conditions to the general public such as road <br /> Dimensions: closures due to debris, numerous power lines down and accidents due to <br /> the ice and snow, and assisted in dispatching the 911 center in <br /> dispatching the fire dept. and medical units. <br /> Scope of Work: PA- 10 -OR- 4169 -PW- 00022(0): <br /> Work Completed <br /> The applicant's Public Works Dept., Street dept, EOC, and call -taker staff <br /> used 56.4 OT hrs. The EOC received calls and dispatched work crews <br /> for emergency work. Public Works personnel also used 22.8 Labor OT <br /> hrs. and 802 equipment hrs. (work crews were out responding to trees <br /> down on roads and were reporting in to the EOC about field conditions). <br /> The same work clasification and personal are not covered in the CAT A <br /> pw. The street dept was out installing portable generators at the street <br /> lights to insure that they were working properly, the street lights power <br /> was knocked out due to the storm. <br /> The Fire Department activated its EOC personnel to assist the 911 <br /> center by answering phone calls and dispatching fire department <br /> personnel to storm related calls. The 911 center used 50.5 hrs. of OT <br /> Labor. No equipment was used by the EOC staff. The Fire Dept. utilized <br /> 20.6 labor OT hrs, 119.1 equipment hrs. in responding to vehicle <br /> accidents, power lines down, falls from the ice and other emergencies <br /> due to the storm. <br /> Summary of Public Works costs: <br /> Incident command staff: 5.4 labor OT hrs. = $259.00 <br /> Call- takers: 51 OT hrs. = $2,145.90 <br /> Hazard assessment team: 22.8 Labor OT hrs. = $ 1,296.12, Equipment: <br /> 802.2 hrs. = $ 5,527.60 <br /> Street dept: 16.3 OT hrs $994.20 <br /> Equipemnt hrs. 61.7= $ 3,772.2 <br /> Total Labor: 95.5 Labor OT hrs. = $ 4,495.64 <br /> Total Equipment: 863.9 hrs. = $ 9,259.80 <br /> "c Summary of Fire Dept. Costs: <br /> sv30h.,k Incident command staff: 50.5 labor OT hrs. = $ 3,625.8 <br /> Incident emergency response staff: 20.6 labor OT hrs. = $ 140.11 <br /> „�� Equipment: 119.1 hrs. = $7,508.10 - (c►C �JU <br /> Total Labor Cost: 71 labor OT hrs. = $ 4,865.91 <br /> Total Equipment: 119.1 hrs. = $ 7,508.10 <br /> DAC cost 18 HRS $ 964.39 <br /> Materials (food for the workers): $157.83 <br /> It states in their policy that if workers are working overtime, their meals <br /> are reimbursed by the city. <br /> I know that project code 182303 = Major emergency call back. It looks <br /> like the EFD employees used this code when they working overtime, or <br /> were called back in for the storm response. <br /> On the EFD timesheets, the project code 182303 which is the storm <br /> https: / /connect l .dhs.gov /emmie /,Danalnfo= isource.fema. net ,SSL +dispatchDestination.do ?... 6/5/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.