New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FEMA-DR-4169-OR PW:22 (Category B)
COE
>
PW
>
POS_PWM
>
Grants
>
Grant 101 - FEMA
>
FEMA-DR-4169-OR PW:22 (Category B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:41:19 PM
Creation date
7/24/2014 1:41:12 PM
Metadata
Fields
Template:
COE_Contracts
COE_Contract_Number
2014-00409
COE_Contract_Document_Type
Correspondence
COE_Contract_Status
Active
COE_Contract_Organization
FEMA / OEM (Oregon Office of Emergency Management)
COE_Identification_Info
2014-00409
Department
Public Works
Contract_Administrator
Schafer
Contract_Manager
Risdal / Lankston
Document_Number
2014-00409
External_View
No
Permanent_Retention
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Federal Emergency Management Agency E- Grants Page 6 of 11 <br /> Special Considerations <br /> 1. Does the damaged facility or item of work have insurance coverage and /or is it an insurable No <br /> risk (e.g., buildings, equipment, vehicles, etc)? <br /> 2. Is the damaged facility located within a floodplain or coastal high hazard area and /or does it No <br /> have an impact on a floodplain or wetland? <br /> 3. Is the damaged facility or item of work located within or adjacent to a Coastal Barrier No <br /> Resource System Unit or an Otherwise Protected Area? <br /> 4. Will the proposed facility repairs /reconstruction change the pre- disaster conditions (e.g., No <br /> footprint, material, location, capacity, use of function)? <br /> 5. Does the applicant have a hazard mitigation proposal or would the applicant like technical No <br /> assistance for a hazard mitigation proposal? <br /> 6. Is the damaged facility on the National Register of Historic Places or the state historic No <br /> listing? Is it older than 50 years? Are there more, similar buildings near the site? <br /> 7. Are there any pristine or undisturbed areas on, or near, the project site? Are there large No <br /> tracts of forestland? <br /> 8. Are there any hazardous materials at or adjacent to the damaged facility and /or item of No <br /> work? <br /> 9. Are there any other environmental or controversial issues associated with the damaged No <br /> facility and /or item of work? <br /> Attachments <br /> Mitigation section is not applicable for your project category. <br /> Cost Estimate <br /> Is this Project Worksheet for <br /> (Preferred) Repair <br /> Material Unit Unit of Subgrant Cost <br /> Sequence Code and /or Quantity Measure Unit Price Budget Class Type Action <br /> Estimate <br /> Description <br /> ' Version 0 * ** <br /> Work Completed <br /> $ Work <br /> 1 9007 Labor 1 LS 9,561.65 PERSONNEL Completed $ 9,561.65 <br /> $ Work <br /> 2 9008 Equipment 1 LS 16,767.90 EQUIPMENT Completed $ 16,767.90 <br /> 3 9009 Material 1 LS $ 157.00 SUPPLIES Work $ 157.00 <br /> Completed <br /> Direct Subgrantee Admin Cost <br /> Direct <br /> Direct <br /> Administrative INDIRECT <br /> 4 9901 Costs 1 LS $ 964.39 CHARGES Subgrantee $ 964.39 <br /> (Subgrantee) Admin Cost <br /> Total Cost : $ 27,450.94 <br /> Insurance Adjustments (Deductibles, Proceeds and Settlements) - 5900/5901 <br /> I I I I I I I I <br /> https: / /connect1.dhs.gov /emmie /,DanaInfo= isource.fema. net ,SSL +dispatchDestination.do ?... 6/5/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.