Federal Emergency Management Agency E- Grants Page 7 of 15 <br /> Work Completed <br /> PAAP Accelerated Debris Work <br /> 1 9222 Removal 31 -90 days — 80% 1 LS $ 0.00 OTHER Completed $ 0.00 <br /> Federal Share <br /> Work <br /> 2 9231 Contract - Debris Removal 1 LS 132,008.6$ CONTRACTUAL Completed 132,008.6$ <br /> Work <br /> 3 9008 Equipment 1 LS 19,314.83 EQUIPMENT Completed $ 19,314.83 <br /> 4 9009 Material 1 LS $ 541.75 SUPPLIES Work $ 541.75 <br /> Completed <br /> Force Account Labor Work <br /> 5 9226 (Straight Time) - Debris 1 LS 43,444.42 OTHER Completed $ 43,444.42 <br /> Removal <br /> Facility Level Cost Estimate Total: $ 195,309.67 <br /> GIS Coordinates <br /> Project Location Latitude Longitude <br /> City Hall 44.0618 - 123.11919 <br /> Special Considerations <br /> 1. Does the damaged facility or item of work have insurance coverage and /or is it an insurable risk No <br /> (e.g., buildings, equipment, vehicles, etc)? <br /> 2. Is the damaged facility located within a floodplain or coastal high hazard area and /or does it No <br /> have an impact on a floodplain or wetland? <br /> 3. Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource No <br /> System Unit or an Otherwise Protected Area? <br /> 4. Will the proposed facility repairs /reconstruction change the pre- disaster conditions (e.g., No <br /> footprint, material, location, capacity, use of function)? <br /> 5. Does the applicant have a hazard mitigation proposal or would the applicant like technical No <br /> assistance for a hazard mitigation proposal? <br /> 6. Is the damaged facility on the National Register of Historic Places or the state historic listing? Is No <br /> it older than 50 years? Are there more, similar buildings near the site? <br /> 7. Are there any pristine or undisturbed areas on, or near, the project site? Are there large tracts of No <br /> forestland? <br /> 8. Are there any hazardous materials at or adjacent to the damaged facility and /or item of work? No <br /> 9. Are there any other environmental or controversial issues associated with the damaged facility No <br /> and /or item of work? <br /> Attachments <br /> Mitigation section is not applicable for your project category. <br /> Cost Estimate <br /> Is this Project Worksheet for PA Alternative Procedures <br /> (Preferred) Repair <br /> Material Unit Unit of Subgrant Cost <br /> Sequence Code and /or Quantity Measure Unit Price Budget Class Type Action <br /> Estimate <br /> Description <br /> * ** Version 0 * ** <br /> htt„c• / /rnnnert1 (Mc onv /emmie /_T)analnfo= isource.fema. net .SSL +dispatchDestination.do ?... 6/4/2014 <br />