New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FEMA-DR-1733-OR PW:6 (Category A)
COE
>
PW
>
POS_PWM
>
Grants
>
Grant 101 - FEMA
>
FEMA-DR-1733-OR PW:6 (Category A)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:41:02 PM
Creation date
7/24/2014 1:40:56 PM
Metadata
Fields
Template:
COE_Contracts
COE_Contract_Number
2014-00409
COE_Contract_Document_Type
Contract
COE_Contract_Status
Active
COE_Contract_Organization
FEMA / OEM (Oregon Office of Emergency Management)
COE_Identification_Info
2014-00409
Department
Public Works
Contract_Administrator
Schafer
Contract_Manager
Risdal / Lankston
Document_Number
2014-00409
External_View
No
Permanent_Retention
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Federal Emergency Management Agency E- Grants Page 8 of 11 <br /> FEDERAL EMERGENCY MANAGEMENT AGENCY <br /> PROJECT WORKSHEET <br /> DISASTER PROJECT NO. PA ID NO. DATE CATEGORY <br /> FEMA 14169 I I DR 1-OR JC00009 039 - 23850 -00 05 -17 -2014 A <br /> APPLICANT: EUGENE WORK COMPLETE AS OF: <br /> 05 -17 -2014: 100 % <br /> Site 1 of 1 <br /> DAMAGED FACILITY: <br /> COUNTY: Lane <br /> Debris Removal <br /> LOCATION: LATITUDE: LONGITUDE: <br /> 44.0618 - 123.11919 <br /> PA-10-0R-4169-PW-00006(0): <br /> City Hall <br /> 1820 Roervalt Ave, Eugene OR <br /> DAMAGE DESCRIPTION AND DIMENSIONS: <br /> PA-10-0R-4169-PW-00006(0): <br /> A severe winter storm occurring February 6 -10, 2014, brought a mixture of arctic air, strong east winds, and significant snowfall along with freezing <br /> rain and ice which caused damage to City of Eugene. These conditions caused accumulation of 3607.06 CY of vegetative debris upon the <br /> Applicant's public properties and various 700 miles of public right of way, trails,roads and other improved areas that hazard to the public. <br /> SCOPE OF WORK: <br /> PA-10-0R-4169-PW-00006(0): <br /> WORK COMPLETED <br /> The Applicant activated its force account resources to undertake debris removal operations to protect public health /safety and protect improved <br /> property. Specifically, the Applicant utilized Force account labor (approximatly 150 employees 5,167 reg time 98 OT) hrs include parks and street <br /> departments, this required a large number of labor hours due to labor intensive hand work was required to move hazard limbs, trees and debris in <br /> various improved areas throughout the city of Eugene,the labor hrs also includes monitoring of the contractors the monitoring of the contractors <br /> were not broken out separately from the debris cleanup hrs., Force account equipment hours (5,303.The acquired Contractors and the applicant <br /> purchased materials to perform the work. The applicant and contractors collected 3607.06 CY of debris which was removed and hauled to various <br /> green waste recycle facilities (Lane Forest and Rexius locations) for the final disposal. They are participating in the Debris Pilot Program. <br /> This PW is for the first 30 days' work.There will be additional PWs for 30 -90 and 90 -120 days <br /> Total Cost for Work Completed is as follows: <br /> Contract $68,865.10 (see scope notes) <br /> Equipment $106,632.29 the applicant is using their own equipment rates which are consistent with FEMA rates which were reviewed by the <br /> project specialist <br /> Labor $ 189,065.78 <br /> Total Project Cost $ 364,563.17 <br /> The applicant affirms via email (attached) that (1) all cut hazard limbs were at least 2" diameter at the cut; (2) all leaning hazard trees were at least <br /> 6" diameter at 4.5' above the ground; (3) all hangers and leaners posed a threat to public health and safety if not removed. Addresses of the <br /> approximate locations where this work was performed are given on the contract billings, which are attached. This is in accordance to their policy. <br /> SCOPE NOTES <br /> The applicants policy allows them to contract for goods & services, up to $75,000, using informal solicitation process (verbal quotes). This <br /> process requires the applicant to get three quotes, which they state they did. This process is described in article 10 of the applicant's purchasing <br /> regulations, page 43, article 10. The applicant states they already had an established contract with CTS Services. This contract included the <br /> scope of work they needed for storm response and a pricing schedule, to get additional contracts in place, the applicants lead worker reached out <br /> to many other contractors to get verbal quotes on prices, and most chose not to respond due their availability. They were already swamped with <br /> private work, they couldn't take on additional work from the City. <br /> According to the agreements between the contractors and the City of Eugene the debris monitoring will be done by the city. The city monitors <br /> were in the field with the contractors. The city monitors periodically checked on the contractors that were performing the work, they also checked <br /> the area after the work was completed for validation. <br /> The applicant utilized out of class personnel to perform tasks such as emergency calls from the public, and site visits of reported hazardous tree <br /> https: / /connect l .dhs.gov /emmie /,Danalnfo= isource.fema. net ,SSL +dispatchDestination.do ?... 5/29/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.