Federal Emergency Management Agency E- Grants Page 6 of 11 <br /> 2. Is the damaged facility located within a floodplain or coastal high hazard area and /or does it No <br /> have an impact on a floodplain or wetland? <br /> 3. Is the damaged facility or item of work located within or adjacent to a Coastal Barrier Resource No <br /> System Unit or an Otherwise Protected Area? <br /> 4. Will the proposed facility repairs /reconstruction change the pre- disaster conditions (e.g., No <br /> footprint, material, location, capacity, use of function)? <br /> 5. Does the applicant have a hazard mitigation proposal or would the applicant like technical No <br /> assistance for a hazard mitigation proposal? <br /> 6. Is the damaged facility on the National Register of Historic Places or the state historic listing? Is No <br /> it older than 50 years? Are there more, similar buildings near the site? <br /> 7. Are there any pristine or undisturbed areas on, or near, the project site? Are there large tracts of No <br /> forestland? <br /> 8. Are there any hazardous materials at or adjacent to the damaged facility and /or item of work? No <br /> 9. Are there any other environmental or controversial issues associated with the damaged facility No <br /> and /or item of work? <br /> Attachments <br /> Mitigation section is not applicable for your project category. <br /> Cost Estimate <br /> Is this Project Worksheet for PA Alternative Procedures <br /> (Preferred) Repair <br /> Material Unit Unit of Subgrant Cost <br /> Sequence Code and /or Quantity Measure Unit Price Budget Class Type Estimate Action <br /> Description <br /> * ** Version 0 * ** <br /> Work Completed <br /> PAAP <br /> Accelerated <br /> Debris Work <br /> 1 9221 Removal 0 -30 1 LS $ 0.00 OTHER Completed $ 0.00 <br /> days — 85% <br /> Federal <br /> Share <br /> Force <br /> Account <br /> Labor <br /> 2 9226 (Straight 1 LS $ OTHER Work $ 185,002.92 <br /> Time) 185,002.92 Completed <br /> Debris <br /> Removal <br /> Force <br /> Account <br /> 3 9227 Labor (Over 1 LS $ 4,062.86 OTHER Work $ 4,062.86 <br /> Time) - Completed <br /> Debris <br /> Removal <br /> 4 9008 Equipment 1 LS $ EQUIPMENT Work $ 106,632.29 <br /> 106,632.29 Completed <br /> https: / /connect 1.dhs.gov/ emmie /,Danalnfo= isource.fema.net,S SL +dispatchDestination.do ?... 5/29/2014 <br />