New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Shasta Ball Field
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Shasta Ball Field
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 1:20:38 PM
Creation date
7/15/2014 1:20:35 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- tight Structure System: 26, 1500 watt metol halide fixtures per field, ottoining a <br /> 30FC /20FC light level, mounted on 8 galvanized steel support structures. 4 of the 8 poles <br /> will support fixtures for 2 fields, no poles will be needed in the outfield orea. Equipment cost <br /> would be $26,000 to $28,000 per field. Installation cost by on outside contractor would be in <br /> the $10,400 to $14,300 range per field. <br /> TOTAL COST $36,400 TO $42,400 per field <br /> I am enclosing information on both of these optional approaches. Becouse Musco's luminore <br /> ossemblies have o remote ballost, and factory aimed fixtures, we are able to guarantee the <br /> projected mointoined light levels for 7 years. If I con be of anymore help please feel free to <br /> give me o call. <br /> Sincer- <br /> ictuf <br /> Terry Rodgers <br />
The URL can be used to link to this page
Your browser does not support the video tag.