ROUGH PLAN OF TREATMENT CENTER <br /> (Approximately 24'x24') <br /> Closet' <br /> Closet 3' x 4' <br /> 4' x5f' <br /> Staff <br /> Bathroom Exam room/ <br /> & Diagnostic Treatment room/ <br /> Laboratory ICU <br /> 6' x 7' <br /> 12' x 10z' <br /> 11' x 6' <br /> Food preparation <br /> area <br /> Office /Reference <br /> library <br /> 9' x 23' <br /> Treatment Center would not be open to the public. With few windows, and only <br /> one in the treatment room, an exhaust /ventilation system will be created to <br /> achieve 15 air exchanges per hour. Current concrete floors will be covered <br /> with linoleum, walls in treatment room will be insulated and covered with <br /> washable material (e.g., formica). Restroom /lab needs improved ventilation <br /> and it, as well as all doorways, need to be brought up to ADA standards; sink <br /> needs to be added in food preparation area Area behind building needs to be <br /> cleaned out (where hillside was cut away) and gutters need to be checked to <br /> stop seepage at bottom of back wall. <br /> The treatment center, caretaker's quarters, and pump house have been recently <br /> re- roofed; all need painting. <br />