New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Bond Proposal 2004
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
Bond Proposal 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 1:16:03 PM
Creation date
7/10/2014 1:15:59 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
When phased in, both options would result in an annual revenue increase of approximately $2 <br /> million. Neither option accounts for inflation. In both options the operating programs would be <br /> restored first and then followed by the capital program. This would preserve the continuity of <br /> established programs. <br /> With an increase in revenue from a fee increase the Public Works Department would consider <br /> the following in determining which programs to restore: <br /> 1. The stormwater program review in which all of the programs were prioritized based upon <br /> a set of criteria including the goals and objectives of the Comprehensive Stormwater <br /> Management Plan and the best management practices (BMPs) of the City's National <br /> Pollutant Discharge Elimination System (NPDES) permit. The last program cut would <br /> likely be the first program restored. <br /> 2. The public input received during the budget process that reflects strong community <br /> support for programs such as the Willamette River clean up and local watershed councils. <br /> 3. The additional requirements of the City's recently renewed NPDES permit. It is <br /> anticipated that the new permit will require the reallocation of resources to water quality <br /> monitoring, quantitative evaluation of BMP effectiveness and more comprehensive <br /> annual reporting. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.