� f <br /> DISCUSSION <br /> The following discussion covers four main areas. First, immediate changes to <br /> services which will result in operational savings in the FY -93 budget. <br /> Second, operational changes occurring during FY -93 which will result in <br /> savings for the FY -94 budget. Third, service changes resulting in one -time <br /> savings. And fourth, services where increases in efficiency may be possible, <br /> but difficult to determine immediate monetary impact. <br /> In addition to the above, I'll conclude with a summary discussion involving <br /> working space needs and associated costs which at this time still remain to be <br /> resolved. <br /> ON -GOING OPERATIONAL BUDGET GENERAL FUND SAVINGS <br /> A) Savings possible for FY -93. <br /> A -1. Transfer a Landscape Architect position which performs design and <br /> contract management activities to Engineering and fund through the <br /> Professional Services Fund. This results in an on -going savings to the <br /> General Fund of approximately $ 56,000. <br /> A -2. Parks Services will take advantage of the bulk purchasing and warehous- <br /> ing operation at Public Works Maintenance. Consolidating purchasing and <br /> warehousing activities would result in an on -going savings to the <br /> General Fund of approximately $ 30,000. <br /> A -3. Consolidating the rough mowing programs can result in an savings to the <br /> General Fund in several ways. First, reducing the frequency of mowing <br /> on undeveloped park land to a level closer to that mandated by Eugene <br /> Code for similar private properties would result in an on -going savings <br /> of approximately $ 17,500. Contracting for the mowing of out -lying <br /> areas and charging costs to appropriate dedicated fund revenue sources <br /> would save an additional $ 5,500. Total on -going savings to the General <br /> Fund would be approximately $ 23,000. <br /> A -4. An agreement has been reached to transfer the responsibility for <br /> planting of "Color Spots" on the Downtown Mall to Eugene Downtown INC. <br /> The transfer of this program will result in an on -going savings to the <br /> General Fund of approximately $ 6,000. <br /> A -5. Several pieces of equipment can be eliminated due to increased availab- <br /> ility of specialized equipment possible through the merger or through <br /> service changes listed above. This equipment includes a rough mower, <br /> dump truck, tractor /loader, roller, ATV, and the General Fund contri- <br /> bution to a crawler. Elimination of this equipment would result in an <br /> on -going savings to the General Fund of approximately $ 30,000. <br /> Implementation of the above proposals would result in a total on -going savings <br /> to the General Fund of $ 145,000 for FY -93. <br /> 2 <br />