New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Workplan Storm, Stormwater
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Workplan Storm, Stormwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 10:53:34 AM
Creation date
7/10/2014 10:53:15 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Iy 4 <br /> c <br /> Stormwater /Wetland Service Team <br /> Long Term Goals and Performance Targets <br /> As of 7/7/94 <br /> A. Comply with federal and state requirements related to flood control, <br /> surface water quality. and related natural resource protection. <br /> - NTDES Permit renewed (annual compliance report accepted) 2000 <br /> - WEW Plan Amendment Approved 1995 <br /> - Maintain or improve the FEMA insurance rating from the US Corp of <br /> Engineers (submit annual report) 1995 <br /> - No exceedance of state water quality standards (fewer ?) <br /> - Meet inspection requirements of the Corp of Engineers re: Amazon <br /> (annually). <br /> - Lack of enforcement activity by the regulatory agencies against <br /> the city <br /> - Meet the Natural Resource protection aspects of Goal 5: Adopt <br /> Natural Resources Functional Plan (1994 or 1995) <br /> - Conform to the Endangered Species Act (project specific) <br /> B. Manage the city's stormwate /A,., service to meet the community's <br /> drainage needs.. surface water quality, and wetlands objectives as cost - <br /> effectively as possible. <br /> TRANSITION TO AN INTEGRATED SYSTEM <br /> 0 &M manuals in place that address multiple objectives of the <br /> stormwater program <br /> - Development standards are implemented that address multiple <br /> objectives of the stormwater program <br /> - Basin plans completed that address multiple objectives of the <br /> stormwater program <br /> - Completed pilot projects that incorporate multiple objectives <br /> - Change of public perception measured. <br /> BE COST- EFFECTIVE <br /> - monitor unit costs. <br /> - tons of sediment removed per $ cost <br /> - % of planned maintenance achieved <br /> - Positive benchmark comparison to private contracts <br /> MEET DRAINAGE NEEDS <br /> - Customer satisfaction ratings on service calls <br /> - No damage claims as a result of flooding <br /> 0 — <br />
The URL can be used to link to this page
Your browser does not support the video tag.