5 .. 4 <br /> STORMWATER <br /> Detailed Service Workplan Production Schedule <br /> 7/20/94 <br /> Th /F Jul 21 Stormwater SC reviews Draft #2 <br /> F Jul 2z Integrate SW SC edits to Draft #2 <br /> M Jul 25 Goals /FY 95 workplan out to Technical Team <br /> Jul 27 Meeting with Tech. Team: <br /> - distribute narrative <br /> - response to full Draft #3 <br /> - agree on performance targets . <br /> - instructions for further edits <br /> F Aug 5 Edits to Draft #3 due from Tech Team•to Jenny <br /> M,T Aug 8 Jenny Integrates (highlights) edits from tech <br /> team <br /> W Aug 10 Draft #4 to SW S <br /> F Aug 12 Meeting with <br /> Aug 15 -19 Complete Draft #5 <br /> F Aug 19 Draft #5 to Sandra & SC (was Aug 10) <br /> F Sep 2 (was Aug 26) Draft to service lead/team <br /> F Sep 9 (Was Sep 2) Changes back to SG <br />