New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Workplan Storm, Stormwater
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Workplan Storm, Stormwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 10:53:34 AM
Creation date
7/10/2014 10:53:15 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 .. 4 <br /> STORMWATER <br /> Detailed Service Workplan Production Schedule <br /> 7/20/94 <br /> Th /F Jul 21 Stormwater SC reviews Draft #2 <br /> F Jul 2z Integrate SW SC edits to Draft #2 <br /> M Jul 25 Goals /FY 95 workplan out to Technical Team <br /> Jul 27 Meeting with Tech. Team: <br /> - distribute narrative <br /> - response to full Draft #3 <br /> - agree on performance targets . <br /> - instructions for further edits <br /> F Aug 5 Edits to Draft #3 due from Tech Team•to Jenny <br /> M,T Aug 8 Jenny Integrates (highlights) edits from tech <br /> team <br /> W Aug 10 Draft #4 to SW S <br /> F Aug 12 Meeting with <br /> Aug 15 -19 Complete Draft #5 <br /> F Aug 19 Draft #5 to Sandra & SC (was Aug 10) <br /> F Sep 2 (was Aug 26) Draft to service lead/team <br /> F Sep 9 (Was Sep 2) Changes back to SG <br />
The URL can be used to link to this page
Your browser does not support the video tag.