New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Wetheads Stormwater
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Wetheads Stormwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 9:17:38 AM
Creation date
7/10/2014 9:17:15 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAR20.'DOC <br /> Page 12 <br /> WETHEADS DECISIONS AND ASSIGNMENTS FOR MARCH 1997 <br /> 1.The Wetheads agreed to discuss the relationship of the restoration criteria to the development criteria at a future <br /> meeting. <br /> 2.The Wetheads devoted the majority of the March 20 meeting and subsequent special meetings held on March 24 <br /> and April 1 to review and discussion of the plan amendments package. The Wetheads arrived at a series of <br /> recommendations for the Hyundai site, Eugene speedway site, and EWEB substation site, and concurred on <br /> a recommendation for a policy addressing existing utility lines in protected wetlands. A final decision on a <br /> policy addressing planned utility lines in protected wetlands was deferred pending Ms. Evans' discussions on <br /> the topic with Public Works staff about the need for proposed sewer line extensions in the plan area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.