RB :mob w <br /> 2/6/59 <br /> NOW, THEMEFORE, the premises being in general as stated in the <br /> foregoing recitals, it is agreed by and between the parties hereto as <br /> follows: • <br /> THINGS TO BE DONE BY STATE: <br /> 1. State shall, at its own expense, prepare plans and specifi- <br /> cations and include in the grading contract for the McKenzie River- Judkins <br /> Point Section of the relocated Pacific Highway, State Primary Highway No. 1 <br /> in Lane County and the relocation and construction of said Q tt Street, cer- <br /> tain floodway channel work as approximately shown on Exhibit "A" attached <br /> hereto and by this reference made a part hereof and as hereinafter detailed. <br /> All materials removed in excavating for said floodways may at State's option <br /> be used in constructing the embankment of the highways. <br /> 2. State shall, at its own expense, construct all structures <br /> carrying the floodways under the said relocated highway and saidnrelo-d <br /> cated "Q" Street, shall construct structures supportin pipe <br /> shall relocate water mains owned by the Eugene Water and Electric Board <br /> as shown on Exhibit "A" and listed hereinafter. <br /> Floodwa_y A: <br /> • <br /> a. Drop structure at Station PL 468. <br /> b. Drop structure at Station PL 500. <br /> c. Double 8 x 4 box culvert at Station PL 531. <br /> d. 45" pipe supports at Station PL 522. <br /> Floodwa B: - <br /> a. Drop structure at Station QL 150. <br /> • <br /> b. Drop structure at Station QL 143. <br /> c. Triple 9 x 7 box culvert at Station QL 133. <br /> d. 45" pipe supports at Station QL 2 106. <br /> e. Relocate 30" and 10" water mains at Station QL 180. <br /> 3. State shall, at its own expense, construct channels for <br /> floodways as follows: <br /> (a) On the East side of the Pacifi9.Highway from <br /> Station L 468+70 to Station L 500, parallel <br /> with the relocated Pacific Highway, thence <br /> -2- <br />