TASKS FOR PERMIT YEAR 4 (Continued) <br /> Task 4: • Implement revised practices. <br /> 0M8 - Storm System Mapping and Data Management <br /> Task 1: Design and develop information systems which manage and integrate data regarding natural <br /> stormwater conveyance systems, basin characteristics, stormwater monitoring results, and <br /> other natural resource features which impact the conveyance system. This will require <br /> investment in added information technologies such as an improved GIS which will support <br /> and integrate area -based analysis drawing on external databases. <br /> 0M9 - Litter Pickup <br /> Task 2: • Identify all highly attended outdoor public events (both privately and publicly sponsored) <br /> that are scheduled each year and evaluate the likely impact and location of potential litter <br /> problems. <br /> • Coordinate with public agencies or private promoters sponsoring scheduled outdoor public <br /> events to ensure sufficient numbers and strategic location of receptacles, and collection <br /> frequency. <br /> • Coordinate public education efforts with BMP ED1. <br /> • Monitor selected highly attended outdoor public events to evaluate the effectiveness of <br /> existing litter prevention and collection practices. <br /> Task 3: • Evaluate the need to collect litter from streets, sidewalks and vacant lots on a regular basis. <br /> Implement revised practices. Document revised practices and provide in the <br /> comprehensive operations and maintenance manual developed under BMP OM1. <br /> Task 4: • Identify areas frequently used for illegal dumping and implement a program to regularly <br /> monitor these sites. Document any revised practices and include in the comprehensive <br /> operations and maintenance manual developed under OM1. <br /> OM10 - Prevent Leaks and Spills from Municipal Trucks <br /> Task 3: • On an ongoing basis, identify the need to modify existing municipal trucks to prevent or <br /> reduce leaks or spills of hauled material. When or if new vehicles are purchased, research <br /> the availability of truck designs that incorporate the prevention of leaks and spills of hauled <br /> material into their design. <br /> Task 5: • Research legal authority and existing regional requirements for controlling discharges from <br /> privately owned trucks. . <br /> IMPLEMENTATION CATEGORY: PLANNING- .:AND ADMINISTRATION <br /> P &A2 - BMP FACT SHEET - Street Design Standards <br /> Task 4: • Implement new design standards as appropriate. <br /> • Conduct periodic review (to coincide with permit renewal) of design handbooks (with <br /> respect to water quality). <br /> \ 91 \TASK6\FINALBMP \FACTSHTS \TASKS 4.PY4 01/04/96 8 <br />