New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
NPDES Stormwater
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
NPDES Stormwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 4:17:57 PM
Creation date
7/9/2014 4:17:49 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br /> TASKS FOR PERMIT YEAR 4 (Continued) <br /> CAPS - Determine Feasibility of Building Retrofitting Facilities <br /> NOTE: The activities conducted as a part of this BMP should be conducted in coordination with <br /> BMP CAP2 and P &Al. <br /> Task 1: • Through land use maps and discussions with relevant City departments, identify areas that <br /> have the potential to construct water quality facilities. Document current efforts including <br /> Amazon channel widening and preliminary site plans on the Amazon and the A -3 channel. <br /> • Through storm sewer system maps and discussions with personnel responsible for flood <br /> control, review the adequacy of existing flood control facilities. <br /> • Prepare a master list of various types of existing facilities with possible retrofit <br /> considerations for each type. References to other studies and existing relevant data will be <br /> included. <br /> • Conduct an inventory (may require site visits) of flood control facilities that will provide <br /> information necessary to determine whether retrofits are ry feasible or not. <br /> • Review the inventory results and select sites and facilities where retrofits would be most <br /> appropriate and feasible. <br /> • For each suitable site, the City will develop a preliminary plan for retrofitting (in the case <br /> of existing flood control facilities) or constructing (in the case of building new water <br /> quality facilities) with a schedule and estimated costs (the City will coordinate this process <br /> with the FEMA, Corp of Engineers, and SCS as appropriate to resolve any flood control <br /> issues). Based on schedule and cost information, the City will prioritize the sites for <br /> retrofit and construction according to projected available resources and according to <br /> priorities identified in comprehensive basin plans and in pilot project plans. Some sites <br /> may be screened from further consideration. <br /> • Develop funding plans for retrofits. <br /> Task 2: • For each selected site, prepare a detailed plan for construction/retrofit and describe a <br /> method for evaluating the effectiveness of the facility (e.g., collecting water quality <br /> samples to assess the performance of the improved facility, measuring sediment <br /> accumulation and removal). <br /> • <br /> • Implement retrofit plans according to priorities. Implement methods for evaluating <br /> effectiveness. <br /> • <br /> IMPLEMENTATION CATEGORY: INSPECTIONS, ENFORCEMENT AND MQNJTORING <br /> MON1 - Strengthen Enforcement for Illicit Connections <br /> Task 3: • Implement new enforcement activities. <br /> 1 <br /> 1 <br /> \ 91 TASK6 1FINALBMP\FACTSHTS \TASKS_4.PY4 01/04/96 2 <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.