New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
NPDES Stormwater
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
NPDES Stormwater
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 4:17:57 PM
Creation date
7/9/2014 4:17:49 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASKS FOR PERMIT YEAR 2 (Continued) <br /> P &A 3 - Incentives to Preserve Private Property <br /> Task 2: • If this BMP is determined feasible, develop an incentive program. Criteria will be developed for determining <br /> whether or not a particular "natural area" qualifies under the incentive program. The City will determine <br /> how incentives would be calculated. <br /> • Obtain necessary approvals for the program and implement. Implementation should include educating the <br /> public about the program along with agency personnel who will administer it. Coordinate with ED4. <br /> P &A4 - Erosion Control Program <br /> Task 3: • Solicit input from selected groups. Revise the document where necessary. <br /> • Work with public education personnel to develop an education program for all affected groups (may be able to <br /> combine with another planned education program). <br /> Task 4: • Work with DEQ to develop a coordinated program for inspecting areas which require erosion control <br /> measures and enforce those requirements. Coordinate inspection and enforcement activities with the new <br /> inspection and enforcement practices created under BMPs MON1 and MON2. <br /> • Develop a monitoring /feedback system to evaluate program effectiveness. <br /> P &A7 - Standards for New Development <br /> Task 3: • Conduct workshops to educate those affected by new development standards. Coordinate with workshop to <br /> educate regarding new erosion control program under BMP P &A4. <br /> Task 4: • Process for adoption with elected officials. <br /> Task 5: • Implement new development standards (including inspections and enforcement). Begin applying requirements <br /> to all new developments. <br /> P &A8 - Mitigation Site Management <br /> Task 3: • Develop maintenance plans for the public sites selected. <br /> \ 91C0753A\ TASK6 \FINALBMP\UACTSHTS \RESP- PTY.PY2 01/04/96 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.