New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Storm Sewer System
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Storm Sewer System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 3:10:14 PM
Creation date
7/9/2014 3:09:45 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Disadvantages: <br /> • More lawsuits based on requirement for on -site solution <br /> • Staff reluctance to move into "innovative" / "untested" design due to risk in approving it <br /> • Standards can contain conditional processes (complexity allows interpretation) will lead to <br /> litigation <br /> • Compensation for land -use taking <br /> • Failed systems causing downstream flooding may lead FEMA to try to establish liability, <br /> which is unclear <br /> STAFF/ SUPPORT /ADMINISTRATIVE RESOURCES <br /> Management Guideline - Planning decisions should weigh the benefits of on -site controls <br /> against the administrative costs for their implementation, including adoption of new codes, <br /> procedures, review processes, and staff resources. <br /> Advantages: <br /> • <br /> Disadvantages: <br /> • Adds time to review process <br /> • Currently no record keeping in ;lace or require for SFD duplex so would require record <br /> keeping <br /> • Some new tracking system needed on GIS by parcel <br /> • More complex administrative process <br /> A -8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.