New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Storm Sewer System
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Storm Sewer System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 3:10:14 PM
Creation date
7/9/2014 3:09:45 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT <br /> City of Eugene <br /> Construction Site Management Practices Checklist <br /> ❑ Install storm drain inlet protection around storm drains that receive runoff directly from <br /> the site. <br /> ❑ Stabilize exposed soils within 2 days if work is performed from October 1 to April 30 <br /> or within 7 days from May 1 to September 30. Use grass, sod, or other groundcover, <br /> mulches, plastic covering, or other appropriate erosion control covers. <br /> ❑ Stabilize stockpiled soils, using grass or other groundcover, mulches, plastic covering, <br /> or other appropriate cover. <br /> ❑ Inspect and maintain all erosion and sediment control structures weekly. Modify <br /> structures if sediments are visible around the perimeter of the site. Replace structures <br /> as necessary. <br /> ❑ Remove the erosion and sediment control structures when groundcover is established <br /> and all bare surfaces are stabilized. <br /> H. CONTROL OF OTHER CONSTRUCTION SITE POLLUTANTS <br /> ❑ Perform litter control and site maintenance regularly. For example, pick up litter, <br /> immediately repair any leaks from equipment kept on -site, and sweep paved surfaces. <br /> (Collect and properly dispose of sweepings -- do not sweep debris into storm drain <br /> inlets.) <br /> ❑ Cover the ground with a tarp when performing sanding, painting, or an other activity <br /> - tliat may produce waste. Properly dispose of debris which is collect one tarp. <br /> ❑ Cover all potential pollutant sources, such as dumpsters, material stockpiles, waste <br /> containers, and drums. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.