New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Storm Sewer System
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Storm Sewer System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 3:10:14 PM
Creation date
7/9/2014 3:09:45 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> - , PUBLIC INVOLVEMENT AND ADOPTION PROCESSES <br /> 3.0 Upon completion of the DAC's draft recommendations, an outreach program to <br /> affected and interested parties will be conducted including a workshop event. Outreach will <br /> occur during the months of September and October (1995). Comments from these efforts will <br /> be brought back to the DAC for consideration. A set of final recommendations, including a <br /> draft ordinance, an administrative order, and a guidance manual will be produced made <br /> available to the general public. Worksessions will be scheduled with the Eugene Council in <br /> January- February 1996, with final action by the Council tentatively scheduled for February- <br /> March 1996. <br /> • <br /> • <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.