Middle Amazon Creek <br /> ,,. Middle Amazon Creek <br /> A. Location <br /> For the purposes of this report, Middle Amazon Creek starts at 24th Avenue and ends at Bailey <br /> Hill Road. <br /> From 24 Avenue to the Fairgrounds, the Middle Amazon Creek flows within a concrete -lined <br /> channel. Between 18th and 14th Avenues, the channel turns into a northwest direction. West of <br /> Jefferson Street, the creek exits the concrete -lined section and flows westward, along the Lane <br /> County Fairground property. At the end of the Fairgrounds, the channel passes under the bridge <br /> at Polk Street and flows toward Westmoreland Park and Garfield Park. In this segment, the creek <br /> is constrained between private property and the bike path. <br /> The creek flows under Chambers Street before it reaches Garfield Park and flows under the <br /> Garfield Street Bridge. The next passes are the bridges at City View Street and Oak Patch Street. <br /> In between the bridge passes, the creek meanders a bit. After the Oak Patch bridge, the channel <br /> flows in a westerly direction under the bridge at Acorn Park, the Richardson bike bridge, and the <br /> Bailey Hill bridge. <br /> B. Geology/ Landforms — Geomorphology/ Stream Shape <br /> The first part of the Middle Amazon Creek flows through a concrete - walled channel. The creek <br /> comes out of the concrete -lined channel on the east side of the 'Lane County Fairgrounds. With <br /> few riffle and pool structures, the creek flows very straight and flat from the Fairgrounds to <br /> Chambers Street. The slopes are very steep in this part. The soil is deep and poorly drained. It is <br /> a typically hydric soil, which is capable of supporting wetland vegetation. <br /> In the whole next segment to Bailey Hill, the end of the Middle Amazon Creek, the slopes are <br /> particularly steep and the channel is still straight and flat with just a few riffle -pool structures. <br /> The soil has the same condition as the part before. There is bedrock in several sections in this <br /> part. <br /> C. Human Activities <br /> In the 1950s, the creek between 24th Avenue and the Fairgrounds was engineered to improve <br /> flood conveyance. Since then, this segment has flowed through a concrete -lined channel. Also <br /> during this time, other portions of Amazon Creek were channelized; this included deepening and <br /> straightening. The section between Oak Patch and Acorn Park was widened in 2001. The banks <br /> of the south side of the channel have been laid bank, expanding the cross section of the creek to <br /> increase capacity and improve natural resource conditions. <br /> • <br /> c <br /> 17 <br />