New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Trees Policy
COE
>
PW
>
POS_PWM
>
Parks
>
Street Trees.Urban Forestry
>
Trees Policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 11:22:29 AM
Creation date
7/9/2014 11:22:23 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
property and clear their debris. We do, however, clear to the property line. <br /> Need to develop policy for city and private trees in ROW. <br /> 4. WOOD CUTTING ON PARK LANDS <br /> Discussion: The issue of what do we do with the wood, issuance of permits. <br /> We currently have informal practices. Jan will work with Adrian and Ben. <br /> 5. TREE /NEW DRIVEWAY INSTALLATION <br /> Discussion: There is nothing in writing. Ben handles case by case. Ben <br /> works with Herb or Dave and the contractor. Need to get standards so that <br /> Engineering and PIC know what is expected. <br /> 6. TREE /UNDER GROUND UTILITY INSTALLATION AND REPAIR <br /> Utility company owned <br /> Private Service <br /> Discussion: Ben has been working with EWEB and US West. They have the <br /> capacity to use boring instruments rather digging trenches. Jan said that <br /> he felt that they would rather trench than bore since trench work is cheaper. <br /> Need to develop standards. The issue of how customer friendly we can be needs <br /> to be addressed. We must have realistic expectations. <br /> 7. TREE /ABOVE GROUND UTILITY INSTALLATION, REPAIR AND MAINTENANCE <br /> Discussion: Same as above. <br /> 8. TREE /STREET WIDENING OR REALIGNMENT <br /> 9. TREE /STREET OVERLAY <br /> 10. TREE /STREET UPGRADE <br /> 11. TREE /STREET NEW CONSTRUCTION <br /> 12. TREE /STREET INTERSECTION WORK <br /> Discussion: Why are we not involved in these project early on? If we have <br /> standards than Engineering or Traffic would know what is expected. If <br /> Engineering wanted an exception to the rule then they would call. Engineering <br />
The URL can be used to link to this page
Your browser does not support the video tag.