New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Trees- Engineering
COE
>
PW
>
POS_PWM
>
Parks
>
Street Trees.Urban Forestry
>
Trees- Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2014 8:12:03 AM
Creation date
7/9/2014 8:12:02 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
1996 Tugman Park
Document_Number
1987 Willow Creek Rd
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
owners informing them that they will receive a tree according to guidelines <br /> for street type listed above. In the cases where the resident is expected to <br /> provide watering the letter will be sent to both property owner and resident <br /> and will provide resident and owner the opportunity to reject planting or <br /> negotiate location and tree type. <br /> Project Manager in Engineering will take the lead in resolving problems and <br /> conflicts with the assistance of the Urban Forester. The construction <br /> contract will provide areas intended for planting with appropriate grade, <br /> cleanup, and backfill. <br /> Engineering transfers final tree plan to Urban Forester's office for <br /> implementation. Implementation cost per tree is transferred from the project <br /> budget to PWM. Implementation includes: <br /> Purchasing of trees of the highest quality to ensure compliance with <br /> Urban Forest Management Plan policy. <br /> Planting of trees through price agreement with vendor or by PWM staff <br /> after project construction is accepted including informing owners of <br /> schedules, resolving locations with owners, and calling for utility <br /> locates 48 hours in advance. <br /> Inspection of tree planting. <br /> Watering and pruning for a three year establishment period by use of <br /> vendor or PWM staff. <br /> Mailing of reminder notices to residents expected to provide watering. <br /> General tree maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.