New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Strike
COE
>
PW
>
POS_PWM
>
Parks
>
POS Director
>
Strike
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2014 1:31:44 PM
Creation date
6/11/2014 1:31:41 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
exempt staff person with the necessary level of certification. Additional staffing <br /> needs could be covered by other exempt staff available. <br /> PUMP STATION OPERATION <br /> This function covers the regional and local wastewater pump ons. The <br /> Wastewater Division also provides O &M services for pu sta ' s serving the <br /> Springfield area under a contract with the City of . pringf • tine wastewater <br /> pump station O &M functions are covered on our oasis current <br /> staffed by 1 supervisor and 2 wastewater to ians. S' rs call -o <br /> are common in any two -week period. Pump :tion O: s ne r- •, -ort <br /> wastewater to the regional treatment plant re aintain t ould <br /> result in direct sewage spills, exposure of t to raw sewage c health <br /> threat), environmental damage, and violation -tory permit requirements. <br /> Regulations require the technical operation •f the p. •ns be supervised by <br /> a level 4 certified collection system • - , and exempt with the <br /> appropriate level of certification. W: • Ie to a ► s staffing needs with <br /> available exempt staff, or by co ing a aintenance work. <br /> Priority 2 <br /> INDUSTRIAL SOURCE CS >` °'`OL <br /> Thi nction cov: emente: • retreatment program for controlling the <br /> •' f - of in k n�f <�f. stes i sanitary sewer system, monitoring of such <br /> • ��= . and s. ° ' e activities (monitoring and identification). This unit is <br /> also 'le for - 'ng the storm water permit program from the state <br /> and co ���� �4 �._ orm - • ambient water quality monitoring. Staffing is on a <br /> 40 - _+� :� sis. currently covered by 1 supervisor and 7 wastewater <br /> ta aintain an effective ISC program could result in improper <br /> s wastes to the sanitary sewer system with subsequent <br /> 'logical treatment process, equipment or structural damage, <br /> workers to health risks. <br /> certification or licensing requirements for ISC staff. Many of the <br /> nt permit responsibilities could be deferred for several weeks to a month. <br /> ponse capability would need to be maintained, even if in an abbreviated <br /> orm. Some monitoring is mandated by regulations and would have to be <br /> maintained. It is likely that staffing needs could be covered by available exempt <br /> staff. <br /> 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.