GC2 <br /> r ,,,X«\ <br /> EUGENE - SPRINGFIELD METRO WATERWAYS STUDY, GI \h5� c13'' Feasibility Study Cost Estimate r r,,,C! \/-'' ( ,� . ' italics = cash italics = cash C4--- <br /> blue = identification/refinement, green = baseline ::i:: t�. gray = reports/documentation \ (2 ' f regular font = in -kind regular font = in -kind / ,rA <br /> Study cost Study cost ' FY 04 FY 05 FY04 -05 FY04 -05 FY04 -05 �' <br /> PRODUCT J - FEASIBILITY REPORT Focus watersheds "Entire" Corps Estimate Corps Estimate Springfield Eugene Lane County (Springfield notes) (Eugene notes) <br /> WBS Code Task 200,000 200,000 line item funds - GI line item funds - GI y� <br /> Sub - Product JA - Engineering Studies /Appendix UPI u <br /> 1 JAA Surveying and Mapping 170,045 82,244 <br /> JAAA Imagery Investigation 11,070 flood mapping Cedar <br /> JAAB Photogrammetric mapping research 12,500 riparian acquis. funds <br /> JAAC Mapping Data 14,690 flood mapping Cedar <br /> JAAD Cartography 24,240 15,000 flood mapping Cedar 1135 flood mapping <br /> JAAE Land Surveys <br /> JAAF Bathymetry . �1 a JAAG Remote Sensing 10,000 ESEE Analysis , <br /> JAAH GIS- Georeference and Database Design <br /> JAAI Plan Formulation Support and Meetings ) <br /> subtotal: 250,000 500,000 170,045 82,244 <br /> 2 JAB Hydrology and Hydraulic Studies /Report <br /> JABA Assessment of Stream and Watershed Conditions - <br /> JABAA Hydrologic Assessment 62,700 125,400 48,490 25,000 25,000 flood mapping Cedar 1135 flood mapping <br /> JABAB Hydraulic, Sediment, Geomorphic Assessments 116,348 232,697 91,743 25,000 10,000 flood mapping Cedar 1135 flood mapping II <br /> subtotal: 179,048 358,097 140,233 0 C ?DO <br /> JABB Alternative Measures <br /> JABBA Identify Measures 23,100 46,200 62,771 12.500 riparian acquis. funds <br /> JABBB Scope Alternative Analyses 27,225 54,450 33,800 <br /> subtotal: 50,325 100,850 96,571 0 <br /> 1 <br /> JABC Alternative Analysis - Projects <br /> JABCA Basin Hydrology Analysis 71,387 285,550 34,754 <br /> JABCB River Hydraulics Analysis 203,262 406,525 42,201 1 <br /> JABCC River Sedimentation and Geomorphic Analyses 73,550 147,100 71,864 <br /> JABCD Site Evaluation 77,550 155,100 42,201 25.000 bank stabiliz. in -kind <br /> subtotal: 425,749 994,275 0 191,040 <br /> JABD Impact Analyses 51,562 103,125 0 0 <br /> JABE Specific Waterway Investigations <br /> JABEA Identification of Alternative Plans /Projects <br /> JABEB Hydraulic Modeling and Project Analyses <br /> JABEC Special Investigations at Amazon Creek <br /> 3 JAC Geotechnical Studies Report 195,000 390,000 0 195,000 <br /> 4 JAD Initial Site Screening & Analysis 109,950 219,900 18,500 67,400 25,000 bank stabiliz. in -kind <br /> 5 JAE Engineering & Design Analysis <br /> JAEA Preliminary Designs 110,272 220,545 110,272 <br /> JAEB Detailed Designs 67,860 90,480 67,860 <br /> JAEC Engineering Support to Plan Formulation 75,777 151,554 75,777 <br /> JAED Engineering & Design Analysis Report 39,596 39,596 39,596 <br /> subtotal: 293,505 502,175 0 293,505 <br /> TOTAL for JA <br /> Sub - Product JB - Socioeconomic Studies /Socioeconomic Appendix <br /> 1 JBA Socioeconomic Data Collection for the Entire Study Area <br /> JBAA Assess Physical Boundary and Major Objectives 4 3,944 3,944 3,200 <br /> JBAB Data Collection for Entire Study Area 0 29,581 <br />