0 <br /> Stewart Pond Complex Akemoval Work Order <br /> July 18, 2007 <br /> d. Excavate and remove concrete foundations and debris and other material <br /> in the areas designated on the attached map down to native soil. <br /> Additional material may need to be removed when contaminated with <br /> non - native soil or fill material. The final grade will be determined by City <br /> of Eugene staff. The boundaries of excavation area will be marked in the <br /> field by City staff, using pin flags. Contractor is responsible for avoidance <br /> and disturbance of areas outside of the project area. <br /> e. The finish grade of all excavated areas shall be determined solely by the <br /> City of Eugene. After excavation of the concrete, the native soil shall be <br /> left as a smooth, flat surface (not abrupt edges) similar to the adjacent area <br /> and suitable for planting. <br /> f. The contractor and crews may work Monday to Friday, 7:30 a.m. to 5:00 <br /> p.m. No work shall be performed on Legal Holidays, Saturday or Sunday. <br /> Work on weekends or working outside of these hours will require prior <br /> approval from the City of Eugene and may or may not be permitted. <br /> CITY OF EUGENE CONTRACTOR <br /> VAQ, v--- <br /> Laurie Mullen Greg Pay <br /> Habitat Coordinator Owner <br /> City of Eugene Greg Payne Trucking & Construction <br /> Date: ? Date: /# V 07 <br /> 2 <br />