New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Laurelwood Golf Course (2)
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Laurelwood Golf Course (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 9:56:00 AM
Creation date
5/29/2014 9:01:07 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2014
PW_Division
Parks and Open Space
Identification_Number
January 14, 2009
Document_Number
Maintenance, Irrigation
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Additionally, POS has been on site and has repaired irrigation mainline. PWE has also been involved with work at <br />Laurelwood, inspecting stockpiling of soil and debris, as well as inspecting construction of private drainage trench <br />along SW boundary of property (West side of fairway of hole # 5). <br />Prior to work described above, in the past year, PWM, and POS have worked at Laurelwood to repair stormwater <br />facilities, including replacing storm vault lids and repairing inlets, as well as several irrigation related issues. <br />Josh Colley <br />
The URL can be used to link to this page
Your browser does not support the video tag.