MEDLIN Johnny R <br />From: HALLETT Rob R <br />Sent: Wednesday, October 29, 2008 7:28 AM <br />To: FINNEY Kevin P; MEDLIN Johnny R <br />Subject: FW: Laurelwood: Fairway 5 Drainage Trench DRAFT EMAIL <br />Some interesting edits made by Ed. <br />Roh <br />From: FREDETTE Ed W <br />Sent: Tuesday, October 28, 2008 3:51 PM <br />To: PATRICK Tim W; HALLETT Rob R <br />Cc: CURTISS Billy R; COLLEY Josh D; STARK Donna L <br />Subject: RE: Laurelwood: Fairway 5 Drainage Trench DRAFT EMAIL <br />Hi Tim - <br />See my comments in BLUE below. <br />Let me know if there is anything else I can do. I also have photos if Craig wants to see them. <br />Ed Fredette <br />Erosion Prevention Specialist <br />City Of Eugene - Public Works <br />Office: (541) 682 -8471 <br />Cell: (541) 501 -0358 <br />From: PATRICK Tim W <br />Sent: Tuesday, October 28, 2008 2:50 PM <br />To: FREDETTE Ed W; HALLETT Rob R <br />Subject: Laurelwood: Fairway 5 Drainage Trench DRAFT EMAIL <br />Importance: High <br />THANKS FOR THE QUICK RESPONSE ON THE DRAINAGE TRENCH WORK UP AT LAURELWOOD. SOUNDS <br />LIKE IT WILL BE A CATALYST TO SOME WORK BY STORMWATER REPS ON THE SITE'S SYSTEM. <br />CRAIG SMITH, THE LAURELWOOD CONTRACT MANAGER AND THE RECREATION DIVISION AIC DIRECTOR <br />WANTED ME TO EMAIL HIM SOME NOTES ABOUT THE DRAINAGE TRENCH. THE FOLLOWING IS A DRAFT SET <br />THAT I INVITE YOU GUYS TO REVIEW AND EDIT AS YOU SEE FIT. I LOOK FORWARD TO YOUR FEEDBACK. <br />THANKS. <br />On Thursday 10/16 1 received a call from a concerned neighbor (Ila Ausland 686 -1675 and 543 -7844) about the stripping <br />of ground vegetation on the hillside that runs on the southwest side of fairyway 5. 1 said I would investigate and call <br />back. <br />On Friday 10/17 1 visited the site with Tom Utt from Irrigation, and inspected the trench work and hillside, and had a <br />conversation with the Laurelwood operators' plans to connect to the storm drain line. Utt felt the work was reasonable, <br />based on the drainage issues that needed to be addressed. I shared with Tod and Will that it would have been best to <br />contact you and /or Rob Hallett prior to the work to see if there were concerns from the City's perspective. Most notably, <br />erosion issues. At the end of the meeting I shared with them that 1 would be contacting Erosion Prevention staff about <br />the project and that a second visit was likely. <br />When I returned to my office, I called Ila, and let her know that the work had been done to solve drainage issues, and <br />that no trees had been removed in the excavation phase--just undergrowth was taken out. She seemed satisfied with <br />the explanation. I also had a phone conversation with Rob Hallett about the Laurelwood operators' work. He expressed <br />disappointment that he heard about the project after excavation had occurred. He also volunteered to contact Josh <br />Colley in Erosion Prevention, and ask for his input. <br />