Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />(541) 682 -8410 <br />To: Cherry City Electric <br />1596 22 Street SE <br />Salem, OR 97302 <br />Date: April 25, 2012 <br />From: Jason Johannesen <br />Project: Intersection Improvement at Coburg Road and Frontier Drive <br />Contract Number. 2011 -505 <br />Job Number: 4619 <br />A warranty inspection has 'been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and /or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />---------FOR PRIVATELY ENGINEERED PROJECTS ONLY---"----- <br />Engineer. Branch Engineering, Inc. <br />Address: 310 Fifth Street <br />Springfield OR 97477 <br />Owner: Ram Properly Development <br />Address: 1590 Willamette Street, Ste 220 <br />Eugene OR 97401 <br />Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety Construction Manage <br />Finance /Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br />Revised 4104 <br />0 <br />