City of Eugene Public Works <br />Closeout Form <br />February 14, 2012 <br />GOOD JOB NUMBER <br />PROJECT NUMBER 985216 <br />PROJ / GJN DESC � 11' Ts` <br />FUND / DESC Budget Expenditures Difference <br />335 - Stormwater SDC <br />233,620.00 <br />238,531.36 <br />(4,911.36) <br />531 - Stormwater Utility - Capital <br />59,911.00 <br />57,373.66 <br />2,537.34 <br />0.00 <br />0.00 <br />0.00 <br />Totals <br />$293,531.00 <br />$295,905.02 <br />($2,374.02) <br />Notes: Ol e, <br />PT <br />/�f"9 r 2 371 C.J 33 y 550 a�C � <br />Warranty /As -built Fee $2,500.00 BJE #66096 <br />Tree's BJE# <br />Z.,�ZZ Zal2 <br />Projec Ma ag Date <br />Principal Civil E gineer Date <br />1. Review funding and expenditures <br />2. Project Manager sign <br />3. Principal Civil Engineer sign <br />4. Forward to PWA <br />