Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682 -5291 <br />(541) 682 -8410 <br />To: Troy A. Hanson, Vice President Date: November 7, 2011 <br />Delta Construction Company <br />999 Division Avenue From: Adam Steffen, Project Inspector <br />Eugene, OR 97404 <br />Project: DELTA PONDS RIPARIAN BENCH CONSTRUCTION <br />Contract Number: 2010 -00011 <br />Job Number: 4659 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and /or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer: <br />Address: <br />Owner. <br />Address: <br />Q:\PROJECTS\PROJ -9 \4659 Delta Ponds Riparian Bench \Correspondence \Contractors \4659 -Final Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager t Revised 4104 <br />Finance /Accts Receivable for assessable projects or City Recorders Office for nonassessable projects �rr✓� <br />