Ash Stone Masonry <br />CCB# 126558 <br />P.O. Box 42014 <br />Eugene, Oregon 97404 <br />541688 0899 11 <br />Invoice # 52 11/13/07 <br />Spencers Butte Dry Stone Trail Work <br />Project 1 <br />The actual wall building on project 1 is approx. 1/3 of the project, with the stone being <br />supplied and delivered to the park, set up of work area staging, excavation and wall preparation <br />being 2/3 of the project. <br />All building stone for project 1 is either at the work area or at the staging area.( more than 1/2 of <br />the stone for project 2 is also at the staging area but not being billed for at this time) . <br />Scaffolding required to create a work area is set up and is being used at worksite. <br />More than 33.3% of the retaining wall has been built and is able to carry a fully loaded city <br />powered wheelbarrow. <br />85-90% of the excavation, rock splitting and wall prep is completed. <br />I conservatively estimate 45% of project 1 is now completed. <br />Due now $11025.00 (minus your retainage from this amount). <br />Thanks, <br />Alan Ash / Ash Stone Masonry <br />0.. * <br />119025-x <br />0.05= <br />551.25*+ <br />119025-+ <br />551.25- <br />109473.75*+ <br />U .csv <br />nnpW <br />p0 2o-0 105 <br />~2q I 4 <br />D, ~ P C C. <br />g -7 <br />~ ( ;~o 16 <br />is-01 <br />