Invoice # 54 <br />Ash Stone Masonry L <br />CCB# 126558 C) <br />P.O. Box 42014 1.c <br />Eugene, Oregon 97404 1-7 <br />A <br />541688 0899 <br />1/6/08 <br />Spencers Butte Dry Stone Trail Work . <br />Project 1 is now complete Remaining 2S% of project 1, $59A0 <br />Project 2 <br />Area is secured and has been made it accessable, all scaffolding to provide staging area for material is <br />set up, excavation has begun, approx 6 ton of building stone is at the building site with another 14 plus <br />tons unloaded at the stone storage area on the trail, in addition I have already paid for another 14 plus <br />tons which I have in my possession at my workshop ready to be loaded and then delivered to the site, <br />high quality Columbia River Basalt. I have on order another 14 ton of Coburg Basalt and 3 tons of more <br />of Columbia River Basalt special pieces. <br />0•* <br />89375•x <br />~t~~~sze • 05= <br />418.75+ <br />418.75- <br />8,375•+ <br />-000 <br />79956.25*+ <br />Project 2 now 10% complete, $2425.00 <br />Total Due Now, $8375.00 minus retainage <br />Thanks, Alan Ash/Ash Stone Masonry <br />6J.- 3 <br />15- 6zo V4 4kr-% A~L) <br />C <br />IVY <br />0 <br />M' <br />~fU <br />