Final Acceptance <br />Completion'of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: KSH Construction <br />PO Box 21431 <br />Keiser, OR <br />97307 <br />Date: January 13, 2011 <br />From: Charles Heath <br />Project: PBM AMAZON PATH REHABILITATION <br />Contract Number: 2009-29 <br />Job Number: 4602 <br />A warranty' inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />QA\PROJECTS\PROJ-2\4602 Bike Path Rehab, Amazon\Correspondence\Contractors\4602 20110113 Final Acceptancedoc.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager <br />Revised 4104 <br />