Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Eugene Sand Construction, Inc. <br />Attn: Jim O'Brien <br />PO Box 1067 <br />Eugene, OR 97440 <br />Date: December 13, 2010 <br />From: Karl Kreutzer <br />Project: Alton Baker Park Lot 8 Access Drive <br />Contract Number: 2010-05 <br />Job Number: 4612 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />. FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />Q:\PROJECTS\PROJ-2\4612\Correspondence\Contractors\4612-20101213kbkFinal Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br />