Final Acceptance Public Works <br />Completion of Warranty Period Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Knife River <br />1001 Division Ave <br />Eugene OR 97404 <br />Date: November 29, 2010 <br />From: Dan Kepley <br />Project: Pavement Bond Measure - Railroad Blvd from Van Buren St to Chambers St <br />Contract Number: 2010-01 <br />Job Number: 4581 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />FOR PRIVATELY ENGINEERED~PROJECTS ONLY <br />Q:\PROJECTS\PROJ-1\4581\Correspondence\Contractors\4581 Final Acceptance Completion of Warranty Period.doc <br />ENG 1122 Contractor File Engineer Owner Surety PV1% k n-- Construction Manager Revised 4104 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects i ~g n <br />